Combined control technology of prestressed anchor-grout-shotcrete for gob-side entry of medium-thick coal seams and the application
Coal Engineering ›› 2025, Vol. 57 ›› Issue (7): 37-44.doi: 10. 11799/ ce202507006
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract:
CLC Number:
TD353
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10. 11799/ ce202507006
http://www.coale.com.cn/EN/Y2025/V57/I7/37
Research and application of full section anchor-grouting support in high stress soft rock roadway
Hard roof control technology under residual coal pillar through hydraulic fracturing with long directional borehole
Collaborative prevention and control technology of “fracture-injection-discharge support”for thick and hard roof working face crossing faults
Collaborative pressure-releasing and reinforcement control technology for deep dynamic pressure roadway
Surrounding rock control technology for track roadway through roof cutting with deep and shallow blasting
Dynamic pressure behaviors and roof disaster mechanism under continuous mining of large mining height working face
Optimization of borehole parameters for goaf gas extraction under roof cutting gob-side entry retaining
Prediction of CH4 displacement rate in CO2 -injected coal using BP neural network