COAL ENGINEERING ›› 2013, Vol. 45 ›› Issue (s1): 29-30.doi: 10.11799/ce201308062
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract:
In order to solve the problem of Shendong mining 1.7m seam continuous mining machine tunneling half coal rock Lane applicability and efficiency issues,a measuring and analysis was conducted on the roadway excavation behaviors of the Shigetai Mine No.2-2 Up seam.The results showed that the day footage with the lower seam thickness decreases,both can be fit to a 4 times polynomial,Using continuous mining machine digging Mine No.2-2 Up seam average monthly coal roadway drilling footage on 900m above,meet the need for rapid excavation,quickly moving、extending contacted Lane center distance and ensuring the quality of equipment maintenance and other measures can improve the driving efficiency .
Key words: Continuous mining machine, Half coal rock Lane, Boring efficiency, Process optimization
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201308062
http://www.coale.com.cn/EN/Y2013/V45/Is1/29
[1] 梁大海. 神东矿区连续采煤机开采工艺系统优化设计[J],煤炭科学技术,2010 (12) :47~49. [2] 李浩荡,栗建平,刘占斌,等. 应用连采机在断层破碎带中掘进工作面巷道[J],煤矿开采,2009(8):52~53. [3] 张启.连续采煤工作面施工工艺探讨[J].华北科技学院学报,2003,(3):14~17. [4] 刘文群.连续采煤机和掘锚机在晋陕蒙地区的应用[J].矿山机械,2010(19): 126~127.