COAL ENGINEERING ›› 2013, Vol. 45 ›› Issue (s1): 58-59.doi: 10.11799/ce201308072
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract:
In datong yungang mine mining height over geological structure and local change support problem, through the forecast flush with directions, and the analysis of rock pressure support damage effects, compared the arrangement "hilt" transport along the tank after wash with a big move change support plan, and "spindle move cut lane" directly into the move change support plan, and the cutting roadway bolt + anchor beam + anchor group + net + monomer column joint support, large section change support technology and working face and cut lane through before and after the ventilation system safety technology have been discussed in detail. Practice shows that the spindle move cut lane "directly into the move replacement of the damaged support technology short construction period, driving less quantity, saving the supporting materials and avoid the loss of coal pillar, the roof, ventilation, electrical and mechanical equipment operation, construction technology to realize the safe and effective control.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201308072
http://www.coale.com.cn/EN/Y2013/V45/Is1/58
[1] 朱庆文.大采高综采工作面成套技术[J].煤炭技术,2004 (11). [2] 杨绪忠,李波,刘思佳.综采工作面拆除时的顶板管理[J].煤矿开采,2002 (4). [3] 田文良,朱加强.锚网支护技术在综采工作面收作中的应用[J].煤矿现代化,2006 (5). [4] 秦其智.大采高工作面停采顶板支护新方法[J].科技信息,2009 (23). [5] 邵玉峰.利用锚网锚索联合支护来实现综采工作面的快速回撤[J].黑龙江科技信息,2009 (17). [6] 靳钟铭,徐林生.煤矿坚硬顶板控制[M].北京:煤炭工业出版社,1994