COAL ENGINEERING ›› 2013, Vol. 45 ›› Issue (s1): 60-62.doi: 10.11799/ce201308073
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract:
Based on the characteristics of abnormal strata behaviours of 42103 first fully mechanized caving face during the initial mining period in Bu'ertai Coal Mine, this paper analyses the causes of abnormal pressure and sums up some comprehensive measures of controlling pressure anomalies, including lowering the top coal release speed, using the pump regulator, improving rated working resistance of stents and ensuring reasonable working-bit mode, etc., which have achieved good results.
Key words: Fully Mechanized Caving Face, Mine Strata Pressure, Abnormal Strata Behaviors, Control Measures
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201308073
http://www.coale.com.cn/EN/Y2013/V45/Is1/60
[1] 孟昭河,程发祥, 李付臣, 宫志.综放面矿压显现异常分析及控制技术[J].矿山压力与顶板管理,2002,(03),65~67. [2] 李建军,刘毅涛.综采工作面液压支架压死的原因及处理方法[J].煤矿机械,2006,(11),146~149. [3] 邢玉章.综放采场矿压显现异常机理的研究[D]. 山东科技大学,2004. [4] 许红杰,邢国富,徐天发.酸刺沟煤矿综放工作面矿压显现异常及控制技术[J].煤炭科学技术,2012年第7期,21~23.