Abstract:
Abstract: Under thick mudstone roof circumstance,large span and high rib heading stability of enclosing rock was more inferior,and support was more difficult. Based on analyzing geological conditions of enclosing rock, in accordance with relevant design criterion,reasonable support parameter was determined,then construction methods and technology was designed. The in-situ experiment result showed that enclosing rock of reloading heading appeared less deformation, the support was effective.
Key words: Key words: Large span, High rib, Thick mudstone, Support parameter, Corbel
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201309012
http://www.coale.com.cn/EN/Y2013/V45/I9/31
[1] 张荣立,何国纬,李铎,等.采矿工程设计手册[M].煤炭工业出版社.2003 [2] GB 50010- 2002,混凝土结构设计规范[ S] . [3]刘文华,邢上志,田向阳 牛腿的抗裂度及承载能力的计算. 河南科学[J],2003,21(6):754-757. [4]郭建忠 注浆锚索支护技术在大断面硐室整体加固中的应用.建井技术[J],2009,30(6):14-15. [5] 吴志祥,赵英利,梁建军等.预应力注浆锚索技术在加固大巷中的应用.煤炭科学技术[J],2001,29(8):10-12.