Abstract:
In order to ensure the safe of mining working face through fault, exposing the tail roadway and other common complex geological conditions ,By strengthening the working face through fault and expose the tail roadway engineering quality management, Tracking measuring method to control working face cutting Layer, 53 next 07 ( northern ) working face expose the tail roadway along the working surface glue along the tail roadway roof advance, No original support failure and collapse phenomenon, Practice shows that the working face through fault and expose the tail roadway, must strengthen project quality management, to take specific measures, in order to create the conditions for safe production of mining working face.
Key words: Coal mining working face, Fault, Tail roadway, Layer control
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201309019
http://www.coale.com.cn/EN/Y2013/V45/I9/50
[1] 钱鸣高,石五平.矿山压力及岩层控制[M].徐州:中国矿业大学出版社,2003. [2] 钱鸣高,缪协兴.岩层控制的关键层理论[M].徐州:中国矿业大学出版社,2003. [3] 杜计平,孟宪锐. 采矿学[M]. 徐州:中国矿业大学出版社,2009. [4] 杜良荣,朱芳队,王红旗. 综采工作面过断层的技术探讨[J]. 中州煤炭,1999(5):13-14. [5] 张瑞,王俊伟. 回采工作面过空巷的方法[J]. 太原:山西煤炭管理干部学院学报,2005,(1):74 [6] 李志国. 综采工作面过断层技术[J]. 煤,2009,18(7):29-31. [7] 杨嘉昌 李强. 综采工作面过断层的顶板控制技术及应用[J].中国西部科技2009,8(4),29-30 [8] 周祖舜;王涛.综采工作面过大断层实践探讨[J].中国煤炭,2011,(5):61-63.