In order to solve the problem of fully mechanized coal mining face with big dip, broken roof, soft floor, water spraying in various situations, and alleviate the tension of mining-excavation relay. The fully mechanized mining equipment machinery installation technology of hydraulic support, d ensure smooth transport of hydraulic support, use of multi-functional manipulator makes hydraulic support for easy, accelerate the speed of installation, improve installation quality, reducing the operation personnel, reduce the labor intensity. The results showed that: mechanical installation technology allows for fully mechanized coal mining face rapid installation, improve labor efficiency, Seven hydraulic supports are installed by each class, which can improve labor efficiency.
Key words: Mechanized rapid installation, Hydraulic support, Multifunctional manipulator, Adjusted direction easily
CLC Number:
TD832.97
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201310014
http://www.coale.com.cn/EN/Y2013/V45/I10/40
[1]蔡庆国.综采工作面设备安装新工艺[J].山西煤碳管理干部学院学报,2005,(2):98-99. [2]张书敬.柴家沟煤矿综放工作面优化设计[J].煤矿开采,2006,(4):30-31. [3]李青松,韩真理,马曙.煤岩固化防突技术在松河矿石门揭煤中的应用[J].煤炭工程,2010,(7):30-31. [4]姜军,张文科.综采工作面机电设备快速安装工艺[J].煤矿机械,2009,30(6):159-161. [5]朱宝军.大采面综采工作面机电设备安装工艺[J].民营科技,2011(9),142. [6]但松林,田德才.复杂地质构造下综采工作面安装工艺的实践[J].煤炭工程,2010,(7),29-31. [7]任彦荣,高鹏.韩家湾煤矿2304工作面综采设备快速安装技术[J].科学论坛,2003,254. [8]彭国营.综采开帮快速安装综采在煤矿中煤矿中的应用[J].工程技术,2002,84. [9]刘伟东,冯宝明,孙景华.大倾角工作面综采设备安装工艺的实施[J]. 河北能源职业技术学院学报,2008,(3),56-57. [10]徐永圻.煤矿开采学[M].中国矿业大学出版社.