COAL ENGINEERING ›› 2013, Vol. 45 ›› Issue (10): 46-48.doi: 10.11799/ce201310016
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract:
To determine the thickness of the safe aquiclude at the top roof of the temporary coal bunke and the possibility of drainage of its top aquifer in a mine in Erdos, core drilling in the spot, testing the physical and mechanical properties of the rock and the water releasing test are used. The result is that the thickness of the top roof of the temporary coal bunke and its roadway and the thickness of the broken-rock circle calculated is 11.62m. The possibility of drainage of its top aquifer is no good. At last, cutting down the height of the temporary coal bunke to the thickness of the safe aquiclude is used to ensure the safe construction of the temporary coal bunke and its roadways.
Key words: the temporary coal bunke, core drilling, water releasing test, the thickness of the safe aquiclude, possibility of drainage
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201310016
http://www.coale.com.cn/EN/Y2013/V45/I10/46
[1]国家安全生产监督管理总局.煤矿防治水规定[M].北京:煤炭工业出版社,2009. [2]曹文贵,赵明华,刘成学.基于统计损伤理论的德鲁克-普拉格岩石强度准则的修正[J].水力学报,2004,(9)