COAL ENGINEERING ›› 2014, Vol. 46 ›› Issue (3): 45-47.doi: 10.11799/ce201403015
Previous Articles Next Articles
,
Received:
Revised:
Online:
Published:
Abstract:
Based on analysis of 12 on 101-2 mining face practice in Ha Lagou coal mine of Shendong mine area, pressure law, working resistance of support, the problems encountered in the mining and economic and mining technology efficiency were analyzed and summarized of the first 450 meters overlong fully mechanized mining face. The results show that: the first pressure behavior presents a segments characteristics and being of strong pressure behavior. The size of cycle exists and the pressure distribution along the face presented “three peak W-type” characteristics. The ahead affect scope and impact of two crossheading in the 450 meters overlong face are similar to the general length face. The reasonable support resistance of 12 on 101-2 face is 10569kN and the adopted supports are able to meet the requirements of the supporting. The tunneling rate is significantly reduced, recovery rate, ergonomics and the annual output is significantly improved in 450 meters overlong face. Safe and efficient mining technical support is provided for similar conditions in Shendong mine area.
Key words: overlong fully mechanized mining face, pressure law, support working resistance, technical and economic benefits, safe mining
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201403015
http://www.coale.com.cn/EN/Y2014/V46/I3/45
[1] 张开智,高延法,夏均民,等.300m超长综放工作面整体顶梁支架受力及参数分析[J].煤炭学报,2004,29(2):133-136. [2] 曹胜根,缪协兴.超长综放工作面采场矿山压力控制[J].煤炭学报,2001,26(6):621-625. [3] 崔树江.超长综放工作面顶板破断规律研究[J].煤炭工程,2010,(2):32-34. [4] 付玉平,宋选民,邢平伟.浅埋煤层大采高超长工作面垮落带高度的研究[J].采矿与安全工程学报, 2010,27(2):190-194. [5] 曹胜根,张东升,杜卫新. 超长综放工作面开采关键技术[J]. 矿山压力与顶板管理,2003,(4):69-71. [6] 刘长友,黄炳香,孟祥军等.超长孤岛综放工作面支承压力分布规律研究[J].岩石力学与工程学报,2007,26(增1):2761-2766. [7] 缪协兴,钱鸣高.超长综放工作面覆岩关键层破断特征及对采场矿压的影响[J].岩石力学与工程学报,2003,22(1):45-47.