COAL ENGINEERING ›› 2014, Vol. 46 ›› Issue (3): 146-148.doi: 10.11799/ce201403046
Previous Articles
Received:
Revised:
Online:
Published:
Abstract:
Based on basic theory of project quality management, refer to the related theory of value chain, On the basis of construction engineering Life-Cycle management, Put forward the concept of Life-Cycle quality supervision, On the basis of the concepts on CEQS and Life Cycle, it builds up a “3-cirle” model on Construction Engineering Life-Cycle Quality Supervision (CELCQS) for the supervision agencies. In this model, government regulatory system plays a principle part, public supervisory control system a second part, and duty subjects take charge of their duties accordingly and directly.
Key words: construction engineering quality, Life-Cycle, supervisory control mode, “Three Circles&rdquo, pattern for supervision
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201403046
http://www.coale.com.cn/EN/Y2014/V46/I3/146
参考文献: [1] 洪天超.建筑全寿命周期的工程质量综合管理探讨[J].福建工程学院学报(增刊),2010,10:99 [2] 孙峻,丁烈云,曹立新.建设工程全寿命周期质量监管体系研究[J].建筑经济,2007,1:28-30 [3] 凌传荣,林知炎.21世纪中国建筑质量管理的新思路[J].重庆建筑大学学报,2000,2:22 [4] 建设部建设工程质量安全与行业发展司.2005 年全国建设工程质量监督执法检查分析报告[J].工程质量,2006,7:1-13 [5] 周显峰,何伯洲,谭大璐.物业管理超前介入与工程质量监督管理[J].哈尔滨工业大学学报,2002,2:77 [6] 秦博.城市工程项目质量数字化监管研究[硕士论文].武汉:华中科技大学,2007 [7] 何运开.建筑工程质量监督管理模式现状分析与改革研究[硕士论文].浙江:浙江工业大学,2012 [8] 郭志贤,扈花芝.工程设计质量监管初探[J].工程质量,2010,2:4