COAL ENGINEERING ›› 2014, Vol. 46 ›› Issue (4): 40-42.doi: 10.11799/ce201404014
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract:
With the coal mine in the west of the Inner Mongolia and the east of the Gansu province, the artificial freezing method is used widely in the construction of shaft passing through the watery strata. As the main components of the artificial freezing, the quality and schedule of freezing drilling directly affects the closure time of two ice poles. Combined with the experience of the artificial freezing engineering in this area, the Bo jiang hai auxiliary shaft ,which net diameter is the greatest, and the He tao yu auxiliary shaft ,which freezing depth is the greatest ,are taken as the typical formation to research so as to approach the technology points of hole straightening ,taking the coal core ,passing through the conglomerate. as provides reference for freezing drilling in the area
Key words: the area of the west of the Inner Mongolia and the east of the Gansu province, freezing drilling, hole straightening, taking the coal core, passing through the conglomerate
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201404014
http://www.coale.com.cn/EN/Y2014/V46/I4/40
[1] 夏文哲,陈成宇,娄季宣,复杂地质条件下冻结造孔质量控制[J]. 煤炭工程,2006,(12):41-43 [2] 李飞越,冻结孔地沟槽施工管理技术[J]. 煤炭工程,2007,(11):39-40 [3] 周卫,地铁隧道超长水平冻结孔定向钻进施工方法[J]. 煤炭工程,2007,(6):57-59 [4] 夏保还,孙建,螺杆定向纠偏技术在新庄矿超深冻结孔施工中的应用[J]. 煤炭工程,2013,(1):32-34 [5] 韩振,陕西长武高家堡煤矿井筒冻结孔施工工艺[J]. 科技创业家,2012,(7):116 [6] 李尚泽,蒲朝阳,赵四海,等,冻结和注浆顶驱钻机控制系统设计[J]. 煤炭科学技术,2012,40(11):88-90 [7] 李铁,对冻结工程水文孔施工的几点认识和看法[J]. 西部探矿工程,2013,(1):153-154