COAL ENGINEERING ›› 2014, Vol. 46 ›› Issue (4): 49-51.doi: 10.11799/ce201404017
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract:
The basic roof of Yuwu mine S2206 high gas full-mechanized caving coal face is dense hard and large thickness, and it is not easy to collapse in intial stage of mining.If large area roof caving suddenly,could lead to the working face mine pressure appear acutely, gas rise suddenly.In order to solve this problem,the concrete measures of weakening the working face roof are introduced. Practice shows that by the method pre-mining deep hole pre-splitting blasting ,weakening roof in advance,we have solved the hazard of large area roof pressure, recovered the top-coal in advance, realized the working face safe and efficient mining.
Key words: Hard roof, Full-mechanized caving coal face, Deep hole pre-splitting blasting
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201404017
http://www.coale.com.cn/EN/Y2014/V46/I4/49
[1]王开,康天合,李海涛.坚硬顶板控制放顶方式及合理悬顶长度的研究[J].岩石力学与工程学报.2009,28(11):2320-2327. [2]高木福.坚硬顶板处理步距的数值模拟[J].辽宁工程技术大学学报.2006,25(5):649-650. [3]崔永杰,孙祺,郑跃兵等.坚硬顶板弱化处理防止瓦斯骤然涌出[J].煤炭技术.2012,30(12):80-82. [4]张学亮,徐刚,张会军等.深孔爆破弱化坚硬顶板影响因素分析及应用[J].中国矿业.2010,19(4):58-60. [5]赵文.超前深孔预裂爆破弱化采煤工作面坚硬顶板技术研究[J].煤矿开采.2012,17(5):88-90.