[1] |
.
Study on supporting technology of 6m high mining height along goaf
[J]. COAL ENGINEERING, 2019, 51(5): 78-81.
|
[2] |
q 11.
Research and Practice of Cutting Pole Protection for Narrow Coal Pillar in Thick Coal Seam Section of Changping Coal Mine
[J]. COAL ENGINEERING, 2019, 51(5): 82-86.
|
[3] |
.
[J]. COAL ENGINEERING, 2019, 51(5): 92-95.
|
[4] |
.
Model test study on interaction between concrete-filled steel tube support and surrounding rock
[J]. COAL ENGINEERING, 2019, 51(4): 68-73.
|
[5] |
.
Research and Application on Technology of Flexible –formwork Concrete in gob-side entry retaining automatically of no-pillar in thick coal seams
[J]. COAL ENGINEERING, 2019, 51(2): 32-36.
|
[6] |
.
[J]. COAL ENGINEERING, 2019, 51(1): 35-39.
|
[7] |
.
Study on Supporting Technology of Soft Rock Roadway under High Geo-stress in Deep Mine
[J]. COAL ENGINEERING, 2019, 51(1): 44-46.
|
[8] |
.
Active-passive combined support technique for large span open-off cut in thick coal seam
[J]. COAL ENGINEERING, 2018, 50(12): 41-45.
|
[9] |
.
Study on Failure Mechanism and Control of High Stress and Soft Rock Roadway Support
[J]. COAL ENGINEERING, 2018, 50(12): 46-49.
|
[10] |
.
Study on roadway deformation mechanism and reinforcement support technology under fault influence
[J]. COAL ENGINEERING, 2018, 50(12): 50-53.
|
[11] |
.
Technology analysis and Application of fully mechanized mining face crossed abandoned shaft
[J]. COAL ENGINEERING, 2018, 50(11): 14-17.
|
[12] |
.
Determination of the Parameters of Filling Wall Based on Large Span of Critical Rock Block in the Gob Side Entry Retaining
[J]. COAL ENGINEERING, 2018, 50(11): 38-42.
|
[13] |
zheng feng0.
Research on Combined Supporting Technology of Coal Roadway under the Effect of Fault Structure
[J]. COAL ENGINEERING, 2018, 50(11): 43-47.
|
[14] |
.
Research on roadway layout orientation and support technology of lower coal seam in very close distance coal seams
[J]. COAL ENGINEERING, 2018, 50(11): 48-50.
|
[15] |
.
[J]. COAL ENGINEERING, 2018, 50(10): 14-18.
|