COAL ENGINEERING ›› 2014, Vol. 46 ›› Issue (7): 46-48.doi: 10.11799/ce201407016
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract:
Soil nailing wall reinforced pre-stressed anchors (SNWRPA) is a kind of common and effective supporting structure. In order to further study stress and deformation, relationship of soil nail tension and anchor force is analyzed through theoretic analysis and numerical simulation. Improved Increment Method (IIM) is adopted to calculate horizontal displacement of composite soil nailing wall in construction, and several influential factors are considered. Such conclusions are drawn. Firstly, pre-stressed anchors should be set for two layers which can ensure safety and economy considering optimization design. Secondly, soil nail forces nearby will be smaller affected by pre-stressed anchors. Thirdly, in view of effect of soil nail on deformation ,IIM will be simple and reliable used to calculate horizontal displacement .
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201407016
http://www.coale.com.cn/EN/Y2014/V46/I7/46
[1] 张强勇,向文.复合土钉墙支护模型及在深大基坑工程中的应用[J].岩土力学,2007,28(10):2087-2090. [2] 董诚,郑颖人,陈新颖等.深基坑土钉和预应力锚杆复合支护方式的探讨[J].岩土力学,2009,30(12):3792-3796. [3] 唐小莉,钱闪光.数值分析在基坑复合土钉墙支护中的应用[J].四川建筑科学研究,2009,35(2):151-156. [4] 韩森.预应力锚索复合土钉墙试验研究及数值模拟[D].吉林大学,2006. [5] 张强勇.岩土工程强度与稳定计算及工程应用[M].北京:中国建筑工业出版社,2005. [6] 杨光华.土钉支护中土钉力和位移的计算问题[J].岩土力学,2012,33(1):137-146. [7] 杨光华,黄宏伟.基坑支护土钉力的简化增量计算法[J].岩土力学,2004,25(1):15-19. [8] 杨光华.深基坑支护结构的实用计算方法及其应用[J].岩土力学,2004,25(12):1885-1896,1902. [9] 中华人民共和国住房和城乡建设部.建筑基坑支护技术规程(JGJ120-2012)[M].北京:中国建筑工业出版社,2012.