COAL ENGINEERING ›› 2014, Vol. 46 ›› Issue (8): 5-7.doi: 10.11799/ce201408002
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract:
This essay will explore the subject of construction organization in relation to the overall plan of mine what is a significant process. While shrink the project time –limit and enhance economic performance as a target, which put emphasis on construction project optimization. It looks at the use of the two systems within the industry and explores the importance of them for ascension and ventilation safety specifically within the context of alternating with three wellbore equipment order. This article will use as a case study a number of mining projects inYuanZiGou and though contrastive analysis will aim to offer optimal solutions to the problem of scheme optimization for time in relation to this example.
Key words: Mine construction, wellbore equipment, scheme optimization
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201408002
http://www.coale.com.cn/EN/Y2014/V46/I8/5
[1] 赵秀臣,岑毅南. 矿井施工组织设计的经济优化[J].建井技术,1999,(6):31~33. [2] 仉伟东,杨胜远,单衍瑞等. 井筒装备施工技术管理[J] 煤矿机械,2001,(12). [3] 杨怀敏,龚炳江. 矿井建设方案优化中相关问题的研究 [J] .矿业研究与开发,2004,10.