Abstract:With the interpretation and understanding on the state documents [2011]15,[2012]15,[2013]10, the paper stated the technical-economic analysis of three-phase construction scheme of mine emergency escape sytstem. Consider that the documents above simplifing properly construction scheme of emergency escape system. And according to the calculation, the safe special pipeline can provide air and oxygen for the underground refuge chamber in the case of disaster, that is technically possible and economically feasible. The construction funds fall 60%, reducing stress for Mine.
Key words: Keywords: emergeney escape system, refuge chamber, special borehole, special pipeline, private oxygen
CLC Number:
TD214
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201411001
http://www.coale.com.cn/EN/Y2014/V46/I11/1
参考文献: ⑴ 孙继平,煤矿井下紧急避险系统与避难硐室建设方案与技术,国家煤炭工业网2013-09-27 ⑵《煤矿井下紧急避险系统建设管理暂行规定》2011-01-25 ⑶《关于煤矿井下紧急避险系统建设管理有关事项的通知》2012-01-20 ⑷《关于加快推进煤矿井下紧急避险建设的通知》