COAL ENGINEERING ›› 2014, Vol. 46 ›› Issue (11): 23-26.doi: 10.11799/ce201411008
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract:
17 coal mine of Shendong coal group corporation through the construction of ground feeding hole, effectively easing the Ishita Sukesuke transport pressure,decreasing transportation vehicles, improve the air quality, reduce the mine auxiliary transportation costs, to ensure the safety of mine auxiliary transportation, the economic effect is obvious。
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201411008
http://www.coale.com.cn/EN/Y2014/V46/I11/23