COAL ENGINEERING ›› 2014, Vol. 46 ›› Issue (11): 27-29.doi: 10.11799/ce201411009
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract:
Shaft aquifer pre-grouting working face, in order to prevent the grouting process in a lot of slurry infiltrated into the working face, reducing the grouting effect, therefore we must construct high strength concrete grouting pad reasonable, if the condition allows setting of rock cap and grout pad constitute pressure, grout pad design is reasonable or not directly effect of the grouting effect, there are many factors affecting grouting pad, is discussed in this paper through the analysis of the effects of grouting pad and combined with the geological and hydrological conditions the fourth coal mine, design and calculate the working face pre - grouting grout pad forms and parameters, guarantee the grouting effect, provides a safe working environment and reliable to work during the 4th coal mine main shaft excavation face pre-grouting, it also provides a theoretical basis for the rational design of the same conditions pre-concreting grout pad.
Key words: pregrouting of working face, grouting pad, parameters of grouting pad, deep shaft
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201411009
http://www.coale.com.cn/EN/Y2014/V46/I11/27
[1] 徐继民.注浆防治水在立井施工中的应用[J].煤矿安全,2008,09:51-54. [2] 孙丙山.站街煤矿副井止浆垫的施工工艺[J].煤炭技术,2007,26(7):12-18. [3] 赵春阳,马虎成.立井工作面预注浆技术[J].河北煤炭,2002,(1):44-46. [4] 孙鹏翔.立井井筒水下混凝土止浆垫施工工艺的研究与应用[J].建井技术,2010,31,(,4):26-28. [5] 徐栓祥.龙固矿深立井高压大流量工作 面止浆垫和岩帽的设计研究[J].山东煤炭科技,2009,(9):136-137. [6] 纪东黎.竖井工作面高压预注浆止浆垫 设计与施工[J].金属矿山,2001,(1):14-17. [7] 李海燕.立井工作面预注浆止浆垫的设 计与施工技术[J].煤炭科学技术,2008,36(3):48-50.