COAL ENGINEERING ›› 2014, Vol. 46 ›› Issue (11): 57-60.doi: 10.11799/ce201411018

Previous Articles     Next Articles

Technological Upgrading of Coal Mine pumping Room Monitoring System

  

  • Received:2014-02-18 Revised:2014-03-24 Online:2014-11-11 Published:2014-11-12

Abstract:

This paper discusses the three shortcomings and the corresponding technological upgrading of the main pumping equipment of the pumping room monitoring system at the Yima coal mine. First of all, through the analysis of the calculation method of efficiency, and the monitoring and controlling points of the monitoring system are designed based on that. Then this paper discusses the new control strategy of peak valley, rotation, and efficient operation of the monitoring system. Finally, the structure and function of the system is introduced.