COAL ENGINEERING ›› 2015, Vol. 47 ›› Issue (1): 18-21.doi: 10.11799/ce201501006
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract: Combined with the practical situation of east flank in mining area No. 9 of Xiandewang Colliery, the technology of continuous mining without coal pillar centralizing in gob-side entry retaining without roadside packing was put forward. Besides, the combination support with function of superpower roof cutting, high resistance transfer pressure and yielding coordination was designed; the support density of single hydraulic prop was calculated. By the relation analysis between face mining and roadway retained support, the arranging construction of mining – retain – maintenance – laying – moving was formed. Practice result has shown that this set of technology realized the continuous and efficient mining and created Considerable economic benefits.
Key words: continuous mining, gob-side entry retaining, superpower roof cutting, support density
CLC Number:
TD823.25+1
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201501006
http://www.coale.com.cn/EN/Y2015/V47/I1/18