COAL ENGINEERING ›› 2015, Vol. 47 ›› Issue (6): 61-63.doi: 10.11799/ce201506020
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract: Based on the large dip angle, large span cutting intraocular bracket upwards from the bottom of the transverse installation technology research. Summary of safe and efficient fast support installation technology, shorten the construction period, improve the work efficiency, and further improve the high dip angle fully mechanized production technology management.
Key words: The large dip angle, large span cutting hole, The support from the transverse installation down, Technology
CLC Number:
TD355+.4
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201506020
http://www.coale.com.cn/EN/Y2015/V47/I6/61