COAL ENGINEERING ›› 2015, Vol. 47 ›› Issue (7): 36-37.doi: 10.11799/ce201507012
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract: Product loading Sinotrans scheme Wen Jia Zhuang Coal Preparation Plant by train loading Sinotrans to auto loading Sinotrans, design personnel through the detailed investigation and calculation, the multi-point loading combined with computer automatic control system to solve a variety of products at the same time loading difficulty, but also solve the problem of low measuring accuracy, the difference of traditional automobile loading efficiency.
Key words: coal preparation plant, truck loading facility, Automation, measure, efficiency
CLC Number:
TD948
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201507012
http://www.coale.com.cn/EN/Y2015/V47/I7/36