COAL ENGINEERING ›› 2015, Vol. 47 ›› Issue (7): 36-37.doi: 10.11799/ce201507012

Previous Articles     Next Articles

Design of loading system in Wen Jia Zhuang Coal Preparation Plant

  

  • Received:2014-05-29 Revised:2014-09-04 Online:2015-07-10 Published:2015-07-15

Abstract: Product loading Sinotrans scheme Wen Jia Zhuang Coal Preparation Plant by train loading Sinotrans to auto loading Sinotrans, design personnel through the detailed investigation and calculation, the multi-point loading combined with computer automatic control system to solve a variety of products at the same time loading difficulty, but also solve the problem of low measuring accuracy, the difference of traditional automobile loading efficiency.

Key words: coal preparation plant, truck loading facility, Automation, measure, efficiency

CLC Number: