COAL ENGINEERING ›› 2016, Vol. 48 ›› Issue (5): 40-42.doi: 10.11799/ce201605013

Previous Articles     Next Articles

Backfilling Technology for Gob-side Entry Retaining and its Application in Wolonghu Coal Mine

  

  • Received:2015-07-07 Revised:2015-08-11 Online:2016-05-10 Published:2016-06-15

Abstract: This paper set coal face 8102 in Wolonghu Coal mine as the research background and comprehensively analyzed its current economic status and geological conditions. We proposed backfilling technology for gob-side entry retaining using new cement concrete by analysis of movement characteristics of the overlying strata and theoretical calculation of the support resistance from the entry-side backfilling materials. Finally, parameters optimization of the backfilling technology is completed using numerical simulation. The in-situ monitoring of the surrounding rock stress proved the successful application of this technology in coal face 8102.

CLC Number: