COAL ENGINEERING ›› 2019, Vol. 51 ›› Issue (5): 101-104.doi: 10.11799/ce201905024
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract: Aiming at the problem that the large hydraulic support of Shanzhai Coal Mine can not be transported by the main transport roadway section of the mine and the capacity of main hoisting winch. Through analyzing the structure of the hydraulic support, the mine transportation condition and the geological condition of the mining area, Using the method of comparison and simulation, determined the stent disassembly and transport design. Design of the Open - Off cut by Simulation of Steering. Through the optimization of the depth of the small coal pillar winch chamber, the section size of the roadway section of the section and the relevant parameters of the layout method. Research indicates. ZF10000 / 20 / 32H type bracket disassembled into three parts to meet the bracket components in roadway transportation; The top cover of the stent adopts special loading platform for fast and safe transportation;When the width of Open-Off cut is 8 m, the height of Open-Off cut is 3.2 m, and the length of shaft bottom is 70 m,the large hydraulic support can meet the stent and fast scheduling.
CLC Number:
TD355+.4
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201905024
http://www.coale.com.cn/EN/Y2019/V51/I5/101