Coal Engineering ›› 2020, Vol. 52 ›› Issue (6): 81-85.doi: 10.11799/ce202006018
Previous Articles Next Articles
Received:
2019-07-17
Revised:
2020-01-05
Online:
2020-06-15
Published:
2020-07-23
CLC Number:
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
参考文献 | |
[1] | 段瑞.水压致裂切顶卸压在治理临空巷道动压变形的应用[J].煤,2019,28(01):58-59. |
Duanrui. Application of hydraulic fracturing roof-cutting pressure relief in controlling dynamic pressure deformation of goaf roadway [J].Coal, 2019,28(01): 58-59. | |
[2] | 许建平. 干河煤矿2-209工作面副巷超前水力压裂切顶卸压技术实践[J].煤矿现代化,2019(03): 33-36. |
Xu Jianping. Practice of advanced hydraulic fracturing roof cutting and pressure relief technology in auxiliary roadway of 2-209 working face in Ganhe Coal Mine [J].Modernization of Coal Mine, 2019 (03): 33-36. | |
[3] | 杨达明,郭文兵,于秋鸽等.浅埋近水平煤层采场覆岩压力拱结构特性及演化机制分析[J].采矿与安全工程学报,2019,36(02):323-330. |
Yang Daming, Guo Wenbing, Yu Qiupigeon, et al. Structural characteristics and evolution mechanism of overburden pressure arch in shallowly buried near horizontal coal seam stope [J]. Journal of Mining and Safety Engineering, 2019, 36 (02): 323-330. | |
[4] | 杨皓博,李仕牧,王帅等. 基于压力拱理论破碎围岩巷道结构失稳研究[J].中国煤炭,2019,45(04),61-65. |
Yang Haobo, Li Shimu, Wang Shuai et al. Structural instability of broken surrounding rock roadway based on pressure arch theory [J]. China Coal, 2019, 45 (04), 61-65. | |
[5] | 吴拥政,康红普.煤柱留巷定向水力压裂卸压机理及试验[J].煤炭学报,2017,42(05):1130-1137. |
Wu Yongzheng, Kanghongpu. Mechanism and experiment of directional hydraulic fracturing in retained coal pillar roadway [J]. Journal of Coal Science, 2017, 42 (05): 1130-1137. | |
[6] | 冯彦军.神东矿区旺采工作面顶板岩层水力压裂控制技术研究[J].煤矿开采,2018,23(04):81-84. |
Feng Yanjun. Study on hydraulic fracturing control technology of roof strata in Wangcheng mining face of Shendong mining area [J]. Coal mining, 2018, 23 (04): 81-84. | |
[7] | 高富强,康红普,林健. 深部巷道围岩分区破裂化数值模拟[J]. 煤炭学报,2010, 35(1):21-25. |
Gao Fuqiang, Kanghongpu, Lin Jian. Numerical simulation of zonal fracture of surrounding rock of deep roadway [J].Journal of Coal Mine, 2010, 35(1):21-25. | |
[8] | 闫少宏,尹希文,许红杰,徐刚等.大采高综采顶板短悬臂梁-铰接岩梁结构与支架工作阻力的确定[J].煤炭学报,2011,36(11):1816-1820. |
Yan Shaohong, Yin Xiwen, Xu Hongjie, Xu Gang et al. Determination of the structure of short cantilever beam-articulated rock beam and the working resistance of support in Fully Mechanized Roof with large mining height [J]. Journal of Coal Science, 2011, 36 (11): 1816-1820. | |
[9] | 徐刚,宁宇,闫少宏.工作面上覆岩层蠕变活动对支架工作阻力的影响[J].煤炭学报,2016,41(06):1354-1359. |
Xu Gang, Ningyu, Yan Shaohong. Effect of creep activity of overburden strata on working resistance of support [J]. Journal of Coal Mine, 2016, 41 (06): 1354-1359. | |
[10] | 王书文,潘俊锋,刘少虹,夏永学等.基于能量耗散率的钻孔防冲效果评价方法[J].煤炭学报,2016,41(S2):297-304. |
Wang Shuwen, Pan Junfeng, Liu Shaohong, Xia Yongxue et al. Evaluation method of borehole scour prevention effect based on energy dissipation rate [J]. Journal of Coal, 2016, 41 (S2): 297-304. | |
[11] | 潘俊锋.煤矿冲击地压启动理论及其成套技术体系研究[J].煤炭学报,2019,44(01):173-182. |
Pan Junfeng. Study on the theory of coal mine rockburst initiation and its set of technical system [J]. Journal of Coal Mine, 2019, 44 (01): 173-182. | |
[12] | 潘俊锋,刘少虹,秦子晗等.深部盘区巷道群集中静载荷型冲击地压机理与防治[J].煤炭学报,2018,43(10):2679-2686. |
Pan Junfeng, Liu Shaohong, Qin Zihao, et al. [J] Mechanism and prevention of Concentrated Static Load rock burst in roadways in deep panel area [J]. Journal of Coal Science, 2018, 43 (10): 2679-2686. | |
[13] | 潘俊锋,王书文,刘少虹,秦子晗.双巷布置工作面外围巷道冲击地压启动机理[J].采矿与安全工程学报,2018,35(02):291-298. |
Pan Junfeng, Wang Shuwen, Liu Shaohong, Qin Zihao. Start-up mechanism of rock burst in surrounding roadways of double-lane layout face [J]. Journal of Mining and Safety Engineering, 2018, 35 (02): 291-298. | |
[14] | 姚建伟.辛置煤矿2-104综放工作面合理留设煤柱尺寸研究[J].煤矿现代化,2019,(04):32-34. |
Study on reasonable size of coal pillars in 2-104 fully mechanized caving face of Yao Jianwei Xinzhi Coal Mine [J].Modernization of Coal Mine, 2019, (04): 32-34. | |
[15] | 张文龙.沿空掘巷窄煤柱应力及围岩变形规律数值模拟研究[J].煤炭与化工,2019,42(02):42-45. |
Zhang Wenlong. Study on Numerical Simulation of stress and deformation law of narrow pillar in gob-side roadway [J]. Coal and Chemical Industry, 2019, 42 (02): 42-45. | |
[16] | 王进,马资敏,王亚军,陈上元.深部切顶留巷预裂切缝技术及其对采场矿压显现规律的影响研究[J].煤炭技术,2018,37(09):173-175. |
Wang Jin, Ma Zimin, Wang Yajun, Chen Shangyuan. Study on pre-splitting and slitting technology of retaining roadway in deep cutting roof and its influence on the law of mining pressure appearance [J]. Coal Technology, 2018, 37 (09): 173-175. |
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||