Coal Engineering ›› 2021, Vol. 53 ›› Issue (2): 132-136.doi: 10.11799/ce202102026

Previous Articles     Next Articles

Prediction of Groundwater Resources Adjustment after Large Open Pit Closure

  

  • Received:2020-02-10 Revised:2020-03-28 Online:2021-02-20 Published:2021-05-10

Abstract: Taking the recently closed pit of Fushun West Open-pit Mine as the research object, a three-dimensional hydrogeological model was constructed using visual modflow, and the analysis of groundwater movement was performed. The simulation results show that the West Open-pit pit will converge to a stable elevation of 60m after the stoppage; The impact of pumping and strata, groundwater flows from the southwest to the northeast, and the Hunhe River changes from a drainage source to a recharge source. The results of the water balance simulation show that entering the pit area is 84141 m3/d, and the artificially discharged water is 56768 m3/d. The best solution; further establish a water resource optimization model and use MATLAB to perform optimization calculations. Urban water allocation is 6 million m3/a, industrial water allocation is 4 million m3/a, and ecological water allocation is 7 million m3/a. The results of the two goals of social benefits are better overall.