[1] 彭赐灯.煤矿围岩控制[M].翟新献,翟俨伟.北京:科学出版社,2014. Syd.S.PENG.Coal Mine Ground Control[M].ZHAI Xinxian,ZHAI Yanwei.Beijin:Science Price,2014. [2]王安.连续采煤机房柱式短壁机械化采煤技术的研究与实践[D].辽宁:辽宁工程技术大学,2002. WANG An.Research and Practice on Mechanized Coal Mining Technology with Short Wall in Continuous Coal Mining Room[D].Liaoning: Liaoning University of Engineering and Technology, 2002. [3]王虹.我国短壁机械化开采技术与装备发展前景[C].//中国煤炭学会.中国煤炭学会2007短壁机械化开采专业委员会学术研讨会论文集.2007:3-13. WANG Hong.Development Prospects of Short Wall Mechanized Mining Technology and Equipment in China[C].China Coal Society 2007 Short Wall Mechanized Mining Professional Committee Academic Symposium Papers. 2007:3-13. [4] 吴恒建.浅谈履带行走式液压支架在复合顶板条件下的应用[J].煤炭工程,2012,(6):112-114. WU Heng-jian. Comments on Application of Crawler Type Hydraulic Powered Support under Complex Roof Condition[J].Coal Engineering ,2012,(6):112-114. [5] 李志强,周茂普.短壁机械化开采顶板控制技术[C].//中国煤炭学会2007短壁机械化开采专业委员会学术研讨会论文集.2007:14-19. LI Zhiqiang,ZHOU Maopu..Control technology of short wall mechanized mining roof.//China Coal Society 2007 Short Wall Mechanized Mining Professional Committee Academic Symposium Papers.2007:14-19. [6]王焱金,李文德,任葆锐,等.履带式行走液压支架在短壁式开采中的应用[J].煤,2001,10(6):30-31. WANG Yanjin,Li Wende,REN Baorui. Application of Crawler Walking Hydraulic Support in Short-wall Mining[J].coal, 2001,10(6):30-31. [7]周凯,李刚,赵帅.短壁开采用履带行走式液压支架研制及应用[J].煤炭科学技术,2013,41(4):85-88. ZHOU Kai,Li Gang,Zhao Shuai. Comments on Application of Crawler Type Hydraulic Powered Support under Complex Roof Condition[J].Coal Science and Technology , 2013,41(4):85-88. [8]李刚.较薄煤层履带行走液压支架支护参数确定及应用[J].煤炭科学技术,2015,43(6):107-111,121. LI Gang. Development and Application of Crawler Walking Type Hydraulic Powered Support Used for Short-Wall Mining[J].Coal Science and Technology , 2015,43(6):107-111,121. [9]张锁江.履带行走液压支架主要支护参数的研究和探讨[J].煤炭科学技术,2002,30(5):52-54. ZHANG Suojiang. Application of Pedrail-walking Type Hydraulic Supports in Board and Pillar Mining method[J].Coal Science and Technology,2002,30(5):52-54. [10]徐亚军,张德生,李丁一.全方位行走式超前液压支架研究[J].煤炭科学技术,2019,47(10):161-166. XU Yajun, ZHANG Desheng, LI Dingyi. Study on advanced powered support with omni-directional walking function[J].Coal Science and Technology ,2019,47(10):161-166. [11]周茂普,曹胜根,江小军.连续采煤机块段式开采矿压显现规律研究[J].采矿与安全工程学报,2014,(3):413-417. ZHOU Maopu, CAO Shenggen, JIANG Xiaojun. The law of rock pressure in the stope with blocking mining by the continuous miner[J].Journal of Mining and Strata control engineering,2014,(3):413-417. [12]李志强.旺格维利采煤法行走支架工作阻力的计算分析[C].//中国煤炭学会.21世纪高效集约化矿井学术研讨会论文集.2001:172-176. [13]马进功. 连续采煤机短壁机械化开采发展现状研究[J]. 煤炭科学技术,2020,48(9):180-188. MA Jingong.Research on development status of short-wall mechanized mining technology of continuous miner [J].Coal Science and Technology,2020,48(9):180-188. [14]荣庆丰,郎琦,罗大伟, 等.履带行走支架车专用压力监测装置的研制[J].煤矿机械,2016,37(9):53-55. RONG Qingfeng, LANG Qi, LUO Dawei.Development on Specific Pressure Monitoring Device for Mobile Roof Support. [J].COAL MINE MECHINERY, ,2016,37(9):53-55. [15]马进功.断层附近短壁开采行走支架压架事故处理研究[J].煤炭工程,2017,49(11):65-68. MA Jin-gong. Determination and application of support parameters powered hydraulic crawler walking powered support in thin seam[J].Coal Engineering, 2017,49(11):65-68. [16]王安中,魏京胜.起伏大拐弯多巷道无极绳绞车选型计算探讨[J].煤炭工程,2013,45(6):12-14. WANG Anzhong,WEI Jinsheng. Discussion on the selection and calculation of endless rope winch in multi roadway with large ups and downs[J]. Coal Engineering,2013,45(6):12-14. |