COAL ENGINEERING ›› 2014, Vol. 46 ›› Issue (9): 49-51.doi: 10.11799/ce201409017
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract:
Based on the 3205 return air roadway of thick seam and large section in Wangpo coal mine of high gas, it analyzes how the high gas and surrounding rock stability of large section coal roadway affect the safe and efficient drifting, and proposes the gas prevention and control measures of synergistic effect between ahead drilling toward the roadway and gas release hole, as well as supporting technology of high pre-stressed and high strength bolt and anchor. Site practical show that the technology effectively put an end to the gas concentration transfinite phenomenon of tunneling face and return current, and guarantee the stability of the surrounding rock, which realize the rapid and safety excavation of high gas coal roadway with large section.
Key words: High Gas Mine, Coal Roadway with Large Section, Rapid Excavation, Gas Drainage while Drivage
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201409017
http://www.coale.com.cn/EN/Y2014/V46/I9/49
1.袁亮.淮南矿区瓦斯治理技术与实践[J].煤炭科学技术,2000年1月,第28卷第1期:10-13. 2.樊勇.巷道快速掘进的影响因素分析[J].山西煤炭,2009年12月,第29卷第4期:20-21. 3.武铭,张超杰.长距离煤巷掘进工作面瓦斯超限的原因分析与对策[J].水力采煤与管道运输[J].2012年3月,第1期:85~86. 4.方良才,杨积海,马向东等.破碎顶板大断面综放煤巷锚网支护[J].矿山压力与顶板管理,2000(3):21-23. 5.康红普,林健,吴拥政.全断面高预应力强力锚索支护技术及其在动压巷道中的应用[J].煤炭学报,2009年9月,第34卷第9期:1154-1159.