| [1] | . 
														
															Comparative Analysis of Coal Mining Bunker Scheme in Oversize Mine
														[J]. COAL ENGINEERING, 2019, 51(4): 6-9. | 
																																																																																
													| [2] | . 
														
															Study on the way and distance of passing chamber setting in gentle slope auxiliary inclined shaft
														[J]. COAL ENGINEERING, 2019, 51(1): 12-15. | 
																																																																																
													| [3] | . 
														
															Design and engineering practice of skip loading chamber in main well bottom of super large coal mine
														[J]. COAL ENGINEERING, 2018, 50(9): 1-3. | 
																																																																																
													| [4] | . 
														
															The design and construction of mine coal bunker
														[J]. COAL ENGINEERING, 2017, 49(8): 67-69. | 
																																																																																
													| [5] | . 
														
															
														[J]. COAL ENGINEERING, 2017, 49(7): 38-40. | 
																																																																																
													| [6] | . 
														
															
														[J]. COAL ENGINEERING, 2017, 49(7): 58-60. | 
																																																																																
													| [7] | . 
														
															
														[J]. COAL ENGINEERING, 2017, 49(7): 115-117. | 
																																																																																
													| [8] | . 
														
															Design and Construction Technology of Newly Wall-mounted Bunker
														[J]. COAL ENGINEERING, 2016, 48(11): 15-17. | 
																																																																																
													| [9] | . 
														
															The Drill Detonate Lead Cavern Technology use at Large Droop Tall Coal Bunker Construction
														[J]. COAL ENGINEERING, 2016, 48(10): 49-51. | 
																																																																																
													| [10] | . 
														
															Thoughts based on IOT for coal mine shelter facilities
														[J]. COAL ENGINEERING, 2016, 48(4): 16-18. | 
																																																																																
													| [11] | . 
														
															
														[J]. COAL ENGINEERING, 2015, 47(11): 101-103. | 
																																																																																
													| [12] | . 
														
															Large diameter, large vertical high coal bunker design and construction
														[J]. COAL ENGINEERING, 2015, 47(10): 42-44. |