COAL ENGINEERING ›› 2017, Vol. 49 ›› Issue (8): 36-38.doi: 10.11799/ce201708010
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract: According to the topography, industrial park project location, underground coal resource deposittion and through the field survey on the location of mine industrial site provides three schemes, and puts forward three development scheme combined with the location and transportion of coal, the advantages and disadvantages from the angle of technology analysis of the three schemes, from the economic point of comparative rationality the three schemes, after comprehensive consideration and approach to the position of industrial site constraints, the final choice of main and auxiliary position respectively the industrial site and inclined shaft mixed development mode, the conclusion has practical significance for the sustainable development of the mine, Zhundong circular economy industrial park and Wucaiwan mining area development.
CLC Number:
TD214
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201708010
http://www.coale.com.cn/EN/Y2017/V49/I8/36