COAL ENGINEERING ›› 2018, Vol. 50 ›› Issue (12): 24-27.doi: 10.11799/ce201812007
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract: Aiming at the problem of coal storage capacity can not be calculated accurately in coal preparation plant, this paper which analyzes coal accumulation state in coal storage facility, establishes three-dimensional model by using BIM technology. The calculation method can not only solve the problem of accurate calculation of coal storage capacity, but also learn from the accurate storage capacity of other materials in the calculation.
CLC Number:
TD948
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201812007
http://www.coale.com.cn/EN/Y2018/V50/I12/24