COAL ENGINEERING ›› 2018, Vol. 50 ›› Issue (5): 56-59.doi: 10.11799/ce201805016
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract: According to the mining and driving mechanized percentage imbalance contradiction occurred in the coal mine,the paper studied the seam gateway rapid driving technology and mode.Basted on the station of the rapid driving technology development,the paper pointed out the problems of traditional rapid driving technology.The paper reviewed the development and present status of the intelligent rapid driving technology research in China and brand,and discussed the key technology and development tendency of intelligent mine seam gateway rapid driving technology.The successful practice of efficient and rapid driving system in Shendong showed that the development ideas of matching,systematic,intelligent driving technology and equipment was correct,meanwhlie,the development prospects of the driving technology and equipment from the driving,support and transportation integration to the driving,support,transportation and auxiliary integration was put forward.
CLC Number:
TD421
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201805016
http://www.coale.com.cn/EN/Y2018/V50/I5/56