| [1] | . 
														
															
														[J]. COAL ENGINEERING, 2018, 50(10): 66-69. | 
																																																																																
													| [2] | . 
														
															Innovation Design of Extra Large Drilling in Hongqinghe Mine
														[J]. COAL ENGINEERING, 2018, 50(8): 7-9. | 
																																																																																
													| [3] | . 
														
															
														[J]. COAL ENGINEERING, 2018, 50(6): 4-7. | 
																																																																																
													| [4] | . 
														
															
														[J]. COAL ENGINEERING, 2018, 50(6): 135-138. | 
																																																																																
													| [5] | . 
														
															
														[J]. COAL ENGINEERING, 2018, 50(4): 3-4. | 
																																																																																
													| [6] | . 
														
															Underground reservoir construction feasibility analysis in 8.0m super large mining height working face
														[J]. COAL ENGINEERING, 2018, 50(2): 6-9. | 
																																																																																
													| [7] | . 
														
															
														[J]. COAL ENGINEERING, 2018, 50(1): 10-12. | 
																																																																																
													| [8] | . 
														
															
														[J]. COAL ENGINEERING, 2017, 49(10): 43-47. | 
																																																																																
													| [9] | . 
														
															Design Research on Xinjiang Zhundong Wucaiwan No.1 Mine Industrial Site Location Selection and Development Method
														[J]. COAL ENGINEERING, 2017, 49(8): 36-38. | 
																																																																																
													| [10] | . 
														
															Discussion on the Design of Green and Safety Mining System in km deep Coal Mine
														[J]. COAL ENGINEERING, 2017, 49(7): 4-7. | 
																																																																																
													| [11] | . 
														
															To explore the old mine gangue in Pingdingshan mining area system
														[J]. COAL ENGINEERING, 2017, 49(2): 5-6. | 
																																																																																
													| [12] | . 
														
															
														[J]. COAL ENGINEERING, 2017, 49(2): 14-16. | 
																																																																																
													| [13] | . 
														
															The Discussion of the Questions about Development Mining System
														[J]. COAL ENGINEERING, 2017, 49(2): 7-9. | 
																																																																																
													| [14] | . 
														
															Setting of Deputy inclined ramp hedge Chamber
														[J]. COAL ENGINEERING, 2017, 49(1): 4-6. | 
																																																																																
													| [15] | . 
														
															Optimized Design on Miluo Coal Mine to??Quickly?Production
														[J]. COAL ENGINEERING, 2016, 48(12): 5-6. |