[1] |
.
Development Status and Key Technologies of Thin Coal Seam Drum Shearer
[J]. Coal Engineering, 2020, 52(7): 0-0.
|
[2] |
.
[J]. Coal Engineering, 2020, 52(6): 6-9.
|
[3] |
.
[J]. Coal Engineering, 2020, 52(6): 10-14.
|
[4] |
.
[J]. Coal Engineering, 2020, 52(6): 15-19.
|
[5] |
.
[J]. Coal Engineering, 2020, 52(6): 26-32.
|
[6] |
.
Application Research of Slit Drilling Machine in Pre-cracking Drilling Construction of 110 Method Roof
[J]. Coal Engineering, 2020, 52(6): 72-75.
|
[7] |
.
Research on Maintenance Decision Optimization of Coal Mine Fully Mechanized Mining Equipment Based on Genetic Algorithm
[J]. Coal Engineering, 2020, 52(6): 164-169.
|
[8] |
.
[J]. Coal Engineering, 2020, 52(3): 157-162.
|
[9] |
.
Improved artificial fish swarm algorithm for high control strategy of Shearer
[J]. Coal Engineering, 2020, 52(2): 136-141.
|
[10] |
.
Research on test & control system of shearer simulated height adjustment experimental device based on LabVIEW
[J]. Coal Engineering, 2020, 52(2): 142-146.
|
[11] |
.
Research on the Control Strategy of Improved Simulated Annealing Shearer Drum Height Adjustment
[J]. Coal Engineering, 2019, 51(12): 0-0.
|
[12] |
.
Dynamics analysis and frame optimization of mine battery handling vehicle
[J]. Coal Engineering, 2019, 51(7): 0-0.
|
[13] |
.
Construction of Biological Model and Prediction of Technical Parameters of Shearer
[J]. , 2019, 51(6): 0-0.
|
[14] |
.
Analysis of Positioning Error of UWB Based on TSOA Positioning Principle for Roadheader
[J]. , 2019, 51(6): 0-0.
|
[15] |
.
Heat dissipation analysis and improvement design of hydraulic system for a large slope support truck
[J]. COAL ENGINEERING, 2019, 51(5): 20-23.
|