| [1] | . 
														
															Feasibility analysis of collapse pillar mining in Hequ open pit mine
														[J]. Coal Engineering, 2022, 54(6): 7-11. | 
																																																																																
													| [2] | . 
														
															Research on Evaluation System of Intelligent Open-pit Mine
														[J]. Coal Engineering, 2022, 54(5): 1-8. | 
																																																																																
													| [3] | . 
														
															Feasibility Analysis of End Slope and Steep Slope Mining Technology in Hequ Open-pit Mine
														[J]. Coal Engineering, 2022, 54(5): 19-25. | 
																																																																																
													| [4] | . 
														
															Application of Micro-power Induced Dust Suppression Technology for First-level Crushing Station Hopper in Open-pit Coal Mine
														[J]. Coal Engineering, 2022, 54(4): 111-116. | 
																																																																																
													| [5] | . 
														
															Stability analysis and optimization design of soft rock slope with faults in open-pit mine
														[J]. Coal Engineering, 2022, 54(1): 148-153. | 
																																																																																
													| [6] | . 
														
															Research on Optimization of Mining Area Steering Scheme in Sheng Li No. 1 open-pit mine
														[J]. Coal Engineering, 2021, 53(9): 0-0. | 
																																																																																
													| [7] | . 
														
															Development, Design, Research and Key Issues of Intelligent Surface Coal Mines In China
														[J]. Coal Engineering, 2020, 52(11): 16-22. | 
																																																																																
													| [8] | . 
														
															Design method of mining parameters for end slope shearer in surface mine
														[J]. Coal Engineering, 2020, 52(11): 23-27. | 
																																																																																
													| [9] | . 
														
															Study on Dynamic Evolution Process of Stress Distribution of Coal Pillar in End Wall Mining
														[J]. Coal Engineering, 2020, 52(10): 81-85. | 
																																																																																
													| [10] | . 
														
															Research on methods about standardized with analysis, processing and regression in Muck-pile shape of Throwing and Blasting
														[J]. Coal Engineering, 2020, 52(10): 109-115. | 
																																																																																
													| [11] | . 
														
															Numerical Simulation and Analysis of Dewatering Scheme for Open-pit Mine
														[J]. Coal Engineering, 2020, 52(9): 122-125. | 
																																																																																
													| [12] | . 
														
															Study on failure mode and stability of dump slope in open-pit coal mine
														[J]. Coal Engineering, 2020, 52(9): 130-134. | 
																																																																																
													| [13] | . 
														
															Application prospects of throwing and blasting single bucket-truck technology
														[J]. Coal Engineering, 2020, 52(8): 38-43. | 
																																																																																
													| [14] | . 
														
															Study on Mechanical Model of Finite Slope under Dynamic Supporting-Backfilling Action in Open-pit Mine
														[J]. Coal Engineering, 2020, 52(7): 131-135. | 
																																																																																
													| [15] | . 
														
															Energy consumption analysis and energy saving potential research based on energy audit in the whole process of open-pit coal mine
														[J]. Coal Engineering, 2020, 52(7): 136-141. |