| [1] | . 
														
															Research on Coal Mine Emergency Capability Based on Logistic Curve and Fuzzy Analytic Hierarchy Process
														[J]. COAL ENGINEERING, 2019, 51(2): 154-157. | 
																																																																																
													| [2] | . 
														
															Reanalysis of Cloud-based Evaluation Index System of Coal Mining Enterprises
														[J]. COAL ENGINEERING, 2015, 47(9): 140-143. | 
																																																																																
													| [3] | . 
														
															The Discussion and Research on Construction of the Underground Coal Mine Energy Saving Assessment Index System
														[J]. COAL ENGINEERING, 2015, 47(6): 146-148. | 
																																																																																
													| [4] | . 
														
															Study on Evaluation of coal technology innovation ability based on BP Neural network
														[J]. COAL ENGINEERING, 2014, 46(12): 135-137. | 
																																																																																
													| [5] | . 
														
															Evaluation on the input dynamics of science and technology of coal enterprises based on the unscertained cluster
														[J]. COAL ENGINEERING, 2012, 1(6): 134-136. | 
																																																																																
													| [6] | . 
														
															Construction of Pre-warning Index System for Coal and Gas Outburst Based on Time Dimension
														[J]. COAL ENGINEERING, 2012, 1(5): 96-98. | 
																																																																																
													| [7] | . 
														
															The construction and application research of time analysis algorithm on coal roadway excavation
														[J]. COAL ENGINEERING, 2012, 1(1): 80-83. | 
																																																																																
													| [8] | . 
														
															Study on Evaluation of Emergency Capability for Coal Enterprise
														[J]. COAL ENGINEERING, 2011, 1(9): 106-108. | 
																																																																																
													| [9] | . 
														
															Study on plugging technology of underground mine for poor sealing boreholes in Zhaogu No.2 Coal Mine
														[J]. COAL ENGINEERING, 2011, 1(7): 33-35. | 
																																																																																
													| [10] | . 
														
															Research on Index System in Environmental Impact Post-Assessment of Coal mine Project
														[J]. COAL ENGINEERING, 2011, 1(6): 132-134. |