COAL ENGINEERING ›› 2014, Vol. 46 ›› Issue (9): 35-37.doi: 10.11799/ce201409012
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract:
As the cross mining roadway was influenced by the mining activities for many times, and there are some technological difficulties, such as severe roadway deformation and uncontrollability of surrounding rock, the author makes a detailed analysis of factors influencing roadway stability by combining with the engineering practice background of 113(lower)08 transport cross heading in Jining No.2 Coal Mine. According to the actual geological conditions of 113(lower)08 transport crossheading,Piecewise dynamic support was applied into the 113(lower)08 transport cross heading, The roadway supporting method is anchor net and sprayed before exposing coal, anchor net ladder in full seam gateway and Bolt net anchor coupling support when Layer spacing is 10 to 40 meter. The results show that this support effectively prevent roof, floor and two sides from deformation and roadway shape remain intact after crossing mining, guaranteeing the safety of the mine.
Key words: Roadway under Overhead Mining, Surrounding Rock Control, Piecewise Dynamic Support, Ground Pressure Monitoring
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201409012
http://www.coale.com.cn/EN/Y2014/V46/I9/35
[1] 钱鸣高,缪协兴,许家林,等.岩层控制的关键层理论[M].徐州:中国矿业大学出版社,2003. [2] 刘桂仁,戴进,张可斌,等.近距离跨采巷道支承压力研究[J]. 煤炭科学技术,2001(9):34-36. [3] 司文,张念超,张慧君,等.跨采巷道围岩加固控制技术研究[J].煤炭工程,2012(5):36-38. [4] 王红胜,张东升,王旭锋,等.综放面近距离跨采下山分区加固技术[J].西安科技大学学报,2007,27(4):559-564. [5] 张学臣,李大勇,陈士海,等.跨采巷道的围岩稳定性预测与控制[J].采矿与安全工程学报,2008,25(3):361-365. [6] 陈炎光,陆士良.中国煤矿巷道围岩控制[M].徐州:中国矿业大学出版社,1994. [7]侯朝炯,郭励生,勾攀峰.煤巷锚杆支护[M].徐州:中国矿业大学出版社,1995:178-217. [8] 蒋金泉,冯增强,韩继胜.跨采巷道围岩结构稳定性分类与支护参数决策[J].岩石力学与工程学报,1999,18(1):81-850. [9]李学华,姚强岭,张农,等.高水平应力跨采巷道围岩稳定性模拟研究[J].采矿与安全工程学报,2008,25(4):420-425. [10] 谢文兵,史振凡,殷少举.近距离跨采对巷道围岩稳定性影响分析[J].岩石力学与工程学报,2004,23(12):1986-1991.