Determination of the Reasonable Coal Pillar Width for Fully Mechanized Top Caving Face when Drifting Along Goaf
2012, 44(4):  5-7.  doi:
Abstract ( 725 )   PDF (2010KB) ( 1099 )  
References | Related Articles | Metrics
Based on the rock strata control theory, in order to determinate the reasonable coal pillar width when drifting along goaf,the key parameter of rock strata broken structure has been mastered and the reasonable coal pillar width was deeply studied by using methods of theoretical analysis. The results indicated that when the coal seam height is 12m and the mining height is 3.5m,the reasonable coal pillar width is 8.05~9.45m for fully mechanized top caving face. Based on this, the computer numerical simulation have been studied for the different coal pillar width:8.05m、8.5m、9m、9.45m. The study results showed that: when the coal pillar width is 9.45m,the elastic area would appear in the middle of the coal pillar and the effect of load performance is better than the other width.So the reasonable coal pillar width is 9.45m.This conclusion had lay the foundation for the determination of reasonable coal pillar width at 8 coal seam top caving face.
Study on technology of regional gas predrainage for coal roadway band by downward crossing hole in Si Jia-zhuang coal mine
2012, 44(4):  10-12.  doi:
Abstract ( 557 )   PDF (936KB) ( 794 )  
References | Related Articles | Metrics
The gas outburst disasters are serious in Si jia-zhuang coal mine, and the casualty accidents caused by outburst occur frequently. So outburst prevention work task is gravely. The mining condition is coal seam group, but there are no conditions of protective seams extraction. In order to achieve the aim of no digging and mining in outburst dangerous area, a method of regional gas pre-drainage by downward crossing hole was adopted in SI Jia-zhuang coal mine. To achieve better effect, the optimization process parameters need be studied on-site. In this paper, the reasonable spacing of downward crossing hole for pre-drainage was studied. The results indicated that the residue gas content was decreased to 7.86m3/t after period 20 days per-drainage with 2.0m spacing in end hole, and up to the standards of outburst danger eliminating
The Design Research and Application of Super High-Water Filling System in Chengjiao Mine
2012, 44(4):  13-15.  doi:
Abstract ( 864 )   PDF (1016KB) ( 1007 )  
References | Related Articles | Metrics
In order to mine the coal under the old town, super high-water material filling-mining technique was brought in by Chengjiao mine to do mining test in the coal face of C2401.According to the working conditions under the shaft, a reasonable filling system was designed, whose production capacity can reach 280m3/h. After many experiments of filling, the results show that: The filling system has simple operation method and high production capacity; Feeding, preparing and piping system can cooperate with each other normally; the slurry of superhigh-water material has good liquidity, is suitable for long distance pipeline transportation, and can be washed away easily after filling; filling-mining technique is a new type of advanced filling method, whose equipment has low initial investment and high degree of mechanization.
application of the locking cage device in vertical shaft
2012, 44(4):  16-17.  doi:
Abstract ( 940 )   PDF (621KB) ( 764 )  
References | Related Articles | Metrics
The design of coal-mine locomotive dispatching communication system based on WIFI
2012, 44(4):  20-22.  doi:
Abstract ( 1216 )   PDF (1187KB) ( 691 )  
References | Related Articles | Metrics
This paper presents a kind of efficient coal-mine locomotive dispatching communication system. Analyze and discuss the existing locomotive dispatching means, including its merits and demerits. In addition, performance comparasions of common wireless communication systems are presented. Whereas WIFI has the advantage of wide coverage, high transmission speed and good expansibility, propose the coal-mine locomotive dispatching communication system based on WIFI. The system has real-time voice communication function and can feedback the status of locommtives and turnouts, which meets the demands of the locommtive dispatching. The system has already run in good condition underground and meets the requirements, promoting the dispatching efficiency.
The comparative analysis on seismic behavior of multiple story light steel structure in different types of braces
2012, 44(4):  23-26.  doi:
Abstract ( 552 )   PDF (1772KB) ( 717 )  
References | Related Articles | Metrics
By using the SAP2000 of nonlinear finite element analysis software, we study on this influence which is the seismic behavior of multiple story light steel structure in different types of brace. Based on constructing the un-braced frames light-steel structure of six layers, concentrica1ly braced, eccentric braced and knee braced were arranged in the structure. Calculated the structure of lateral stiffness and natural vibration period which under the effect of M.8 earthquake. Four species structure system in comparative analysis by using two bands of classical seismic waves, compared the dynamic characteristics and seismic behavior in four species structure of steel frame.
Freezing hole quality control and safety of rapid construction techniques
2012, 44(4):  27-28.  doi:
Abstract ( 574 )   PDF (460KB) ( 578 )  
References | Related Articles | Metrics
Abstract: This thesis takes the YangLiu Dongfeng mine as an example, the freezing wind bore well construction quality control programs and to freeze the security hole the rapid construction techniques.
Application Study of Medium-length Hole Blast in Huayuan Coal Mining
2012, 44(4):  35-36.  doi:
Abstract ( 679 )   PDF (830KB) ( 872 )  
References | Related Articles | Metrics
Application study of medium-length hole blast is proceeded at the western belt tunneling in order to ensure first mining area and second mining area continuing regularly. According to the section configuration, supporting mode, rock character and performance mode of the western belt tunneling, blasting technique of quasi-burn cut is extracted based on analyzing the merits and faults and the cut mechanics of existing cut mode, and the charge table and the blasting parameter is appropriately designed; the technique of inverse initiation and full-face blast is used. The blasting effect is satisfied. The mining footage of per shift increases 2.2-2.3m and the monthly footage increases 120m because of the use of medium-length hole blast at the western belt tunneling. Tt is the maximum footage of the western belt tunneling.
Numerical simulation of supporting methods about coal roadway with large dip kicking goaf
2012, 44(4):  37-39.  doi:
Abstract ( 615 )   PDF (1507KB) ( 910 )  
References | Related Articles | Metrics
The support question of headentry of 66111 coalface in Xinzhuangzi Colliery of Huainan Mining-Group is a typical question about roadway stabilityl kicking goaf with large dip and composite roof. The article simulated different support methods with FLAC5.0,and reached a conclusion that the support method under similar condition needed a positive and initiative bolting support system,then take reinforcement measures to achieve high strength and integrity.The combined support method using anchor and U-shelf can effectively control the deformation of surrounding rock, with reference to similar condition roadway controlling.
Analysis of hydrogeological characters and prediction of water inflow in Hongling
2012, 44(4):  46-48.  doi:
Abstract ( 614 )   PDF (401KB) ( 620 )  
References | Related Articles | Metrics
Abstract:Based on the water inflow observation data and the stratum data of Hongling coal mine, the water inflow was calculated by the analytic method and analogue method of hydrogeology, obtained results of the maximum annual water inflow in Hongling mine were 447 m3/h and 422.9 m3/h. After analysis, the water inflow results 422.9 m3/h was more accurate, by the analogy method to calculate, which can be used the basis of water damage prevention and safety production in Hongling mine.
The idea of green mining concept, strengthen the comprehensive treatment and utilization of mine water
2012, 44(4):  49-50.  doi:
Abstract ( 692 )   PDF (650KB) ( 710 )  
Related Articles | Metrics
Abstract:: Grass tower coal mine based on their position on hydrogeological condition, face their own lack of water resources in predicament, go green environmental protection, the road of circular economy, the introduction of new technology, new technology, to increase water treatment and recycling of water resources measures, make production wastewater and industrial area sewage under effective control and improvement. Reduced from direct drinking water source water protection in Mulun River, the water quality. On the construction of sustainable and stable ecological system, improve the surrounding mining area ecological environment condition.
study of Gravity Paste-like filling Technique in Caozhuang Coal Mine
2012, 44(4):  51-54.  doi:
Abstract ( 695 )   PDF (1284KB) ( 833 )  
Related Articles | Metrics
Abstract: The 81006 working face of Caozhuang coal mine was mined with the gravity Paste-like filling technique, gravity paste-like filling technique system was introduced, and the effect of the filling working face was evaluated. The results indicate that the amount of compression of top and bottom roof of advanced roadway was 174mm, 108mm averaged, mining with filling could effectively control the strength of ground pressure. Filling body’s max amount of compression was 104mm, rate of 5.2%, top tight filling had a good effect. The stress inside the filling body increased gradually, the max stress is 13.02Mpa, almost equaled to the original stress which was 15.02Mpa. It took almost 20 days for the stress inside of filling body achieving the original stress from the beginning of filling, the rate of filling density was good, the filling body could support the whole gravity of overburden strata. The earth’s surface barely sunk and got efficiently protected after filling.
Research on re-mining technology of Minitype Coal Mine Destructive Area
2012, 44(4):  55-58.  doi:
Abstract ( 651 )   PDF (1085KB) ( 782 )  
References | Related Articles | Metrics
Abstract: Based on the impact of mini-type coal mine destructive area on safe mining in many mining area, Adopting Ruimi filling material to grout and fill mini-type coal mine destructive area is proposed combined with the specific conditions of fully mechanized caving face passed through mine gob area in extremely thick coal seam at Underground Mine II. In this way, the slurry which has a liquidity automatically affluxes into loose coal pile and caving gangue. The filling concretion body can cement with coal pile and gangue effectively and have a certain degree of integrity. Through establishing mechanical model, we get the lower limit depth of the filled regenerated roof by using theoretical analysis and calculation. The feasibility of the result proved in industrial tests. As a result, the technology of grouting for backfilling re-mining is an advanced method in mining mini-type coal mine destructive area which can maximize mining coal resources left in mini-type coal mine destructive area and is also a result which conforms to the direction of green mining.
Reconstruct on Endless Rope Winch in Underground Transportation
2012, 44(4):  62-63.  doi:
Abstract ( 669 )   PDF (575KB) ( 710 )  
Related Articles | Metrics
This article introduces the operation condition about the endless rope winch in under -ground transportation of the DaLiu coal mine. According to the actual requirements of the coal mine, refer to the project about that reconstructed the endless rope winch, Proves the feasibility of the reconstruction project through the transformation of the use of the operation.
Application research of the Spray led by High pressure airflow
2012, 44(4):  64-66.  doi:
Abstract ( 628 )   PDF (768KB) ( 929 )  
References | Related Articles | Metrics
Abstract : To reduce the dust concentration in working face,reduce the number of worker's pneumoconiosis,avoid the Malignant accident,such as Dust explosion,this article gives out the Key Technology and Application of the Spray led by High pressure airflow,on the base of Roller coal winning machine Producing dust mechanism,combine with the theory of Fluiddynamics.accounting the Basic principle and Roll suck mechanism of the Spray led by High pressure airflow,nalysing the interaction in dust in the Spray led by High pressure airflow;introducing the main main factors influencing the spray though the industrial test,determinting the actual effect,providing new ideas and methods For the prevention and control of dust , and have achieved good effect.
Research on the Application of Electrosorption Process in the Mine Water
2012, 44(4):  67-69.  doi:
Abstract ( 632 )   PDF (1200KB) ( 816 )  
References | Related Articles | Metrics
Electrosorption process is taken to treat the mine water, industrial test is carried on. Under the condition of the test, electrosorption process can efficiently remove the inorganic salts, chloride, alkalinity, hardness, and part of the organics in the mine water, the production water can meet the requirements of power plant circulating cooling water. The problems, which should be pay attention to when take electrosorption process to treat the mine water, such as energy consumption, discharge of concentrated water, pretreatment, etc., are proposed.
Analysis of the DMI screen-bowl centrifuge for fine coal de-watering at Bao-De Coal Preparation Plant
2012, 44(4):  70-72.  doi:
Abstract ( 1177 )   PDF (587KB) ( 647 )  
References | Related Articles | Metrics
North Bao-De Plant combines DMI screen-bowl centrifuge with Andritz plate-and-frame filter press to de-watering fine coal. The article analyzes the performance of DMI screen-bowl sedimentation based on the date of density of the feed to the thickener, the underflow of thickener and the filtrate of DMI screen-bowl centrifuge, which indicates that when the feed concentration is 354.6g/l, the filtrate concentration is 69.8g/l, the recovery of coal is 85.83%, and especially the recovery of -0.045mm fine coal is 82.79%. In the production process, product of DMI loosening, no reunion, low moisture, has an excellent performance. The article concludes the shortcoming of this equipment in use also, put forward three solutions to solve, to improve the slime-water treatment system.
Research and Application of Mine Transient Electromagnetic About Detection Technology
2012, 44(4):  73-75.  doi:
Abstract ( 696 )   PDF (2676KB) ( 632 )  
Related Articles | Metrics
This paper introduces the basic principle about mine transient electromagnetic detection technology, and shows the difference about the apparent resistivity calculation formula between the mine and ground based on the structure of the transient field. It decorates 11 measuring points, thus can detect the geological anomalies in front of roadway head-on by adjusting the angle between the normal direction of the antenna and left, ahead, right of roadway head-on. The variation of electric properties of medium in the direction of roof and floor about the work face was detected by adjusting the angle between the normal direction of the antenna and roof, floor of coal seam face. Isolines of apparent resistivity are drawn after the collected data is processed. According to the geological material, we can accurately determine the position and how much water of the geological anomalies. The detection results show that the effect of the method in mine coal hydrological detection is perfect, so it can be considered a quick, effective exploration method to solve the mine coal hydrological geological problems.
Analysis of rational upper extraction limit below the fourth aquifer in Wugou Mine
2012, 44(4):  79-81.  doi:
Abstract ( 700 )   PDF (1315KB) ( 797 )  
Related Articles | Metrics
The exploitation of 10th coal seam in Wugou mine is restricted by the aquifers above it, especially the fourth aquifer. To determine the rational upper extraction limit below the fourth aquifer in Wugou Mine and extract the coal trapped by the fourth aquifer as much as possible and safely. This paper takes the 1011 face as an example, the rational upper extraction limit below the fourth aquifer in Wugou Mine is analyzed through theoretical calculation and numerical simulation using the RFPA software. The results show that the height of water-flowing fractured zone above the 1011 face is 52.84m and the rational upper extraction limit can be determined as -300m. The results can also provide references for determining the rational upper extraction limit of the other working faces with the similar geological conditions.
Study on the Gas Outburst Danger during Heading Excavation in Coal
2012, 44(4):  82-84.  doi:
Abstract ( 609 )   PDF (728KB) ( 570 )  
References | Related Articles | Metrics
Based on analyzing mechanical properties of coal containing gas and their failure types, we draw a conclusion that coupling effect between the Ⅱ failure type of the coal containing gas and highspeed gas seepage leads to the occurrence of gas outburst, which provided theoretical basis for the stress distribution characteristics of coal before heading face and preventing the occurrence of sudden gas outburst. The relationship between the safety width of the destressed zone and the gas ourburst danger as for a colliery are discussed, and the safety width equation of destressed zone in the wall of coal tunnel is derived and verified by a colliery. The results is significant to the prediction of gas outburst in the coal tunnel, the reasonable support for the tunnel.
Numerical simulation and dynamic monitoring analysis of roadway group in deep coal mine
2012, 44(4):  88-90.  doi:
Abstract ( 598 )   PDF (2026KB) ( 743 )  
References | Related Articles | Metrics
In order to study disturbed effects by excavation of neighboring roadways, numerical simulation and on-site dynamic monitoring analysis of roadway group in Zhuji Coal Mine are carried out. The results show that surrounding rock mass stress, deformation, anchor cables tensile force and area of plastic zone of railway laneway increase as a result of the disturbed effects by excavation of adjacent tunnels. On-site monitoring data show that disturbed effects have spatiotemporal characteristics, railway laneway suffers large deformation, and surrounding rockmass has rheological property. Conclusions obtained will devote to the following studies.
Study on area outburst prevention effect checkout method of Pre-drainage of coal road way belt methane
2012, 44(4):  95-97.  doi:
Abstract ( 903 )   PDF (863KB) ( 737 )  
References | Related Articles | Metrics
in order to improve efficiency of Pre-drainage of coal road way belt methane area outburst prevention effect checkout and ensure safety in production,a method of using gas desorption indexes Q3,Q20 and gas content to check on the effective of area outburst prevention rank by rank was put forward,and the the relation between gas desorption indexes and gas content,gas pressure was also studied by experiment way. the effect of on-site application is good.
Experiment Research on Testing Technology of Gas Explosion Flame Parameter
2012, 44(4):  98-100.  doi:
Abstract ( 680 )   PDF (1188KB) ( 779 )  
Related Articles | Metrics
In order to study the feature of gas explosion flame fronts in the coal mine gas explosion accident, experiments of gas explosion flame propagation were done in a small pipeline in laboratory simulation of tunnel. The temperature, ion current, overpressure and photoelectric signal of flame front at the same cross-section in tube were recorded by subtle thermocouple, ion probe, pressure transducer and photoelectrical transducer at the same time. The results show that the signals of photoelectric, temperature and ion current recorded run faster a little than the overpressure signal; The value of the highest temperature, the peak ion current and the maximum overpressure of flame front were1238.8℃, 2.28atm and 258nA with the same gas concentration of 10.17% .The flame thickness that figured out by temperature signal was 44.8cm and that by ion current signal was 68.5cm.And there are belong to the same order of magnitude. The experimental results are good for the further understanding of gas explosion flame in gas explosion accidents and to provide some reference for mine explosion-proof equipment and warning design.
Analyses on FTIR of pure coal in low-temperature oxidation
2012, 44(4):  101-103.  doi:
Abstract ( 656 )   PDF (706KB) ( 857 )  
Related Articles | Metrics
Abstract: Pure coal oxidation process at low-temperature(<100℃) was studied by FTIR. In this paper, evolution of peaks area in different FTIR spectra of coal functional groups was analyzed. The result indicates that with oxidation time rising, peaks area of hydroxyl (-OH) first decreases and then increases, ether oxy (Ar-O-Ar’、R-O-R’) were increasing, carboxy (-COOH) appeared; aromatic hydrocarbon (-CH) and aliphatic hydrocarbon (-CH2) decreased and aromatic framework C=C were not reaction during the oxidized process, further speculate the reaction pathways in the low-temperature oxidation process. Hydrophilicity index on the surface of the coal was calculated according to the surface hydrophilic and hydrophobic groups, the result shows that hydrophilicity index consistent with variation of coal contact angle.
Methords and Principles to Simplify Complicated Ventilation Networks
2012, 44(4):  104-106.  doi:
Abstract ( 642 )   PDF (414KB) ( 984 )  
Related Articles | Metrics
With the increasingly large mine ventilation system, and more complex ventilation network topology, it is very difficult to analysis ,optimize and forecast the mine ventilation system.To achieve the simplification of complex ventilation network, three ways are proposed.They are the equivalent Simplifying of complex ventilation networks , the fuzzy Simplifying of complex ventilation networks and the compounded Simplifying of complex ventilation networks.The equivalent simplified the process to be follwed in the principles and the Equivalent transformation of parameters about wind resistance and Fan performance are researched.Finally,with the Application about the ventilation network of kongzhuang Coal Mine,it shows that the pore complex Mine ventilation network simplification can reduce the node ratio was 35.9%, 38.6% decrease compared to the branch, and the error is less than 5%; if ventilation network only to its equivalent simplified to reduce the nodes 27.2%, 29.1% decrease compared to the branch, then there is no error.
Research on the new type pedal equips of hydraulic support
2012, 44(4):  115-116.  doi:
Abstract ( 608 )   PDF (721KB) ( 919 )  
Related Articles | Metrics
Abstract :The main structure form that aims at currently hydraulic support pedal analyzes the shortage and blemish of current structure. Aim at a this kind circumstance, study a kind of new device and as to it's carry on structure analysis and improvement. That lock tightly equips to act for an old structure form, can the reasonable orientation give different work environment under of inclination angle, to hydraulic support pedal in can get better application and expansion.
Design and Application of Abrasive Water Jet Cutting Machine in Coal Mines
2012, 44(4):  117-119.  doi:
Abstract ( 834 )   PDF (763KB) ( 929 )  
References | Related Articles | Metrics
Abrasive water jet cutting technology is a safe and “cold” cutting technology, which will not cause gas explosion resulting from sparks. A portable Abrasive Water Jet Cutting Machine is designed and manufactured for cutting operations in coal mines. The equipment is divided into two main parts and connected by a high pressure hose. Workers can hold the equipment by the hand-held spray gun for cutting operation and at a cutting speed of up to 40mm/min, while the gauge pressure of system, nozzle wear and abrasive consumption can be monitored by the pressure gauge. The equipment is used to ensure the safety of cutting operation at coal mines.
Research on heat transfer of mine refuge CO2 open-type air conditioner
2012, 44(4):  120-122.  doi:
Abstract ( 659 )   PDF (1154KB) ( 1037 )  
References | Related Articles | Metrics
Air conditioner is the key part of the life support system of mine refuge, with the function of air filtration, cooling and dehumidification. The thermodynamic analysis on heat transfer process of the CO2 open-type air conditioner was carried out firstly. Following that, two design scheme of heat transfer process using capillary tube or expander were designed and compared by means of analyzing calculation. It showed that:under the same initial environment temperature of 25℃,the heat absorption of refrigerant using capillary tube was 217.2 kJ/kg,80 percent of which was latent heat;The heat absorption of refrigerant using Multi-stage expander and single-stage expander was 283.5kJ/kg and 247.3 kJ/kg respectively, and maximum output power was 68.2 kJ/kg and 33.3 kJ/kg refrigerant respectively. Through the analysis and comparison,it is feasible to apply capillary tube or single-stage expander to the heat transfer process of mine refuge CO2 open-type air conditioner.
Processing Technology on the Tooth Profile by Using Electric Spark Method
2012, 44(4):  123-124.  doi:
Abstract ( 591 )   PDF (858KB) ( 673 )  
Related Articles | Metrics
This paper, by starting with the formation of the compound tooth profile of coal-cutter’s pin gear, suggests using new processing method on new tooth profile, namely the electric spark processing method. Then it illustrates the principles of how to use electric spark to process compound tooth profile in detail. At last, based on this principle, it designs the methed to processing the tooth profile of pin gear.
Configuration and Monitor System Designed by .NET Interoperation
2012, 44(4):  125-127.  doi:
Abstract ( 593 )   PDF (772KB) ( 672 )  
References | Related Articles | Metrics
Before the .NET developed, many unmanaged configuration and monitor program codes have been developed by programmers, which was strictly tested and reused. The problem that COM is called in the .NET programming environment was often met by programmers. This paper gave an introduction to .NET interoperation firstly, and then demonstrated the interoperation method in detail by a real project.
Remote transmission of data mining face of the status quo and development trend
2012, 44(4):  128-129.  doi:
Abstract ( 595 )   PDF (290KB) ( 704 )  
References | Related Articles | Metrics
This paper analyzes the mining face underground mine equipment data acquisition and network status ,of the Industrial Ethernet and wireless data transmission technology in the coal mines in the application, analysis of the fully mechanized coal face equipment, data transmission technology bottlenecks, propose ways to solve technical bottlenecks, and finally make wireless plus wired Workface data transfer mode
The solutions of major hazard warning recognition System of Coal mine and the Research and application of data transmission system
2012, 44(4):  130-131.  doi:
Abstract ( 648 )   PDF (628KB) ( 660 )  
References | Related Articles | Metrics
Abstract: Base on the production practice condition of Kailuan Qian Jia-ying mining, this paper focus on the existing problems of water, fire, gas and roof monitoring and state the current situation in coal mine. It also research and design the platform of major hazard warning recognition system and the application of data transmission system about Qian Jia-ying mining. This project is a research and application about the monitoring of major hazards and disaster warning technology of mine, including hydrological geology, coal spontaneous combustion, gas and roof pressure. It is closely related to the safety production in mines. It is helpful to improve prevention ability and emergency handling ability of coal mine disaster. Keywords: Coal mine, hazards, data transmission ,network
The Underground Localization Algorithm of Wireless Networks Based on Virtual Nodes Emendation
2012, 44(4):  132-135.  doi:
Abstract ( 630 )   PDF (1245KB) ( 700 )  
References | Related Articles | Metrics
Aiming at the problem that the Modified Weighted Centroid Localization (MWCL) algorithm has a high localization error when it is used under the complex underground coal mine circumstances,Weighted Centroid Localization algorithm based on virtual nodes emendation is presented. The algorithm based on MWCL rectifies the range of evaluated location using Signal Strength Indicator (RSSI) of anchor received by unknown nodes and utilizes the virtual nodes to implement MWCL algorithm. The simulation results show that, the improved algorithm outperforms the MWCL algorithm under the same condition.
Discussion on coal corporation develop strategy in post-economic crisis era
2012, 44(4):  136-138.  doi:
Abstract ( 700 )   PDF (594KB) ( 613 )  
Related Articles | Metrics
The next five year will be the strategic opportunity period of coal corporation optimized industry chain and up the value chain. Based on the analysis of the challenges coal corporation facing in post-economic crisis era,this paper discussed four development strategy, which contain remoulding the coal corporation, combination of industry and finance ,developing the emerging industry, and the withdraw of part industry. The further improvement proposals were provided.
Analysis of Safety Input in Coal Enterprises of HeNan Province Based on Grey Relation Entropy
2012, 44(4):  139-141.  doi:
Abstract ( 563 )   PDF (608KB) ( 727 )  
References | Related Articles | Metrics
With the statistical data of coal mine enterprise invest in HeNan province from 2006 to 2010 ,grey relation entropy method was put forward .After calculating the values of grey relation entropy and entropy relation grade between affecting factors,such as security technology,industrial health,safety education,labor protection products and other factors,and the returns of coal mine enterprise investment or loss of the coal mine accident,the main affecting factors of coal mining enterprise investment and loss of the coal mine accident were obtained based on the sequence of each compared mapping variable .This study result is beneficial for the raising of effective countermeasures and for the reducing of coal mine accidents.At the same time,this method has the advantage of object measure,simple algorithm,less sample consumption and objective result .