煤炭工程 ›› 2024, Vol. 56 ›› Issue (4): 16-21.doi: 10. 11799/ ce202404003

• 设计技术 • 上一篇    

浅埋煤层房采破坏区充填复采技术研究与应用

马金奎,郑立永,高新建,常云博,李强   

  1. 1. 北京天地华泰矿业管理股份有限公司,北京 100013
    2. 中国矿业大学(北京),能源与矿业学院,北京 100083

  • 收稿日期:2023-02-01 修回日期:2024-03-21 出版日期:2023-04-20 发布日期:2024-12-09
  • 通讯作者: 李强 E-mail:1185636205@qq.com

Research and application of filling and remining technology in shallow coal seam damaged area

  • Received:2023-02-01 Revised:2024-03-21 Online:2023-04-20 Published:2024-12-09
  • Contact: Li QiangQiang E-mail:1185636205@qq.com

摘要:

针对浅埋煤层前期开采遗留的大量房采破坏区严重影响现阶段工作面正常开采的问题, 以五家沟煤矿5-1 号煤层15301 工作面的赋存情况和开采条件为研究背景, 采用煤矿探巷机器人和机载三维激光扫描系统, 探查出靠近15301 辅运巷道三个房采区的情况, 对房采破坏区失稳机理进行研究, 确定了破坏区支护强度, 通过对充填材料不同配比实验, 同时结合填充效果的探查结果, 提出了安全快速通过充填区技术。研究与实践表明: 当破坏区支护强度Pk≥2. 1 MPa 时, 可避免房采破坏区失稳; 确定了满足五家沟煤矿充填的主体材料为充填料Ⅰ, 其中, 水泥、粉煤灰掺入比例为3 ∶7, 水灰比为1 ∶(0. 8~1. 2); 对房采区进行充填后, 利用安全快速通过充填区技术, 顺利完成了15301 工作面房采破坏区充填复采, 取得了良好的技术与经济效益, 为类似条件下的浅埋煤层开采提供技术借鉴。

关键词: 浅埋煤层 , 房采破坏区 , 充填材料 , 充填复采 , 分层充填

Abstract: Aiming at the problem that a large number of room mining failure areas left by the early mining of shallow coal seams seriously affect the normal mining of the working face at this stage, taking the occurrence and mining conditions of the 15301 working face of No.5-1 coal seam in Wujiagou Coal Mine as the research background, the coal mine exploration robot and the airborne three-dimensional laser scanning system are used to explore the three room mining areas near the 15301 auxiliary transportation roadway. The instability mechanism of the room mining failure area is studied, and the support strength of the failure area is determined. Through the experiment of different proportions of filling materials, the reasonable filling scheme is determined. Combined with the exploration of filling effect, the technology of safe and rapid passage through the filling area is proposed. The research and practice show that when the support strength Pk≥2.1 MPa in the failure zone, the instability of the failure zone can be avoided. It is determined that the main filling material is filling material I with cement and fly ash mixing ratio of 3:7 and water cement ratio of 1:(0.8~1.2), which is the main material to meet the filling of Wujiagou Coal Mine ; after the filling of the room mining area, the safe and fast passing through the filling area technology was used to successfully complete the filling and remining of the room mining failure area of the 15301 working face, and good technical and economic benefits were obtained. It provides technical reference for shallow coal seam mining under similar conditions.

中图分类号: