Large mining height are broken a fully mechanized working face wash belt and replace support technology application research

  • Received:2013-04-26 Revised:2013-06-26 Online:2013-08-12 Published:2013-08-12

摘要:

针对大同云冈矿大采高工作面过地质构造和局部更换支架的难题,通过预测冲刷带的走向,分析矿压对支架的损坏影响,对比了布置“刀把子”运输顺槽过冲刷带大搬家更换支架方案,与“梭形搬家切巷”直接推进小搬家更换支架的方案,并对切巷锚杆+锚索梁+锚索组+网+单体柱联合支护、大断面更换支架工艺和工作面切巷技术进行了详细论述。实践表明:采用“梭形搬家切巷”直接推进小搬家更换损坏支架技术工期短、掘进工程量少,节约了支护材料和避免了煤柱损失,现场的顶板、通风、机电设备操作、施工工艺都实现了安全有效控制。

Abstract:

In datong yungang mine mining height over geological structure and local change support problem, through the forecast flush with directions, and the analysis of rock pressure support damage effects, compared the arrangement "hilt" transport along the tank after wash with a big move change support plan, and "spindle move cut lane" directly into the move change support plan, and the cutting roadway bolt + anchor beam + anchor group + net + monomer column joint support, large section change support technology and working face and cut lane through before and after the ventilation system safety technology have been discussed in detail. Practice shows that the spindle move cut lane "directly into the move replacement of the damaged support technology short construction period, driving less quantity, saving the supporting materials and avoid the loss of coal pillar, the roof, ventilation, electrical and mechanical equipment operation, construction technology to realize the safe and effective control.