[1] 宁宇. 大采高综采煤壁片帮冒顶机理与控制技术[J]. 煤炭学报,2009,34(1):50-52.
NingYU,Mechanism and control technique of the rib spalling in fully mechanized mining face with great mining height.Journal of China Coal Society,2009,34(1):50-52.
[2] 华心祝,谢广祥. 大采高综采工作面煤壁片帮机理及控制技术[J]. 煤炭科学技术,2008,36(9):1-4.
HUA Xin-zhu XIE Guang-xiang Coal wall spailing mechanism and control technology of fully mechanized high cutting longwall coal mining face[J].Coal Science and Technology,2008,36(9):1-4.
[3] 郝海金,张勇. 大采高开采工作面煤壁稳定性随机分析[J].辽宁工程技术大学学报,2005,24(4):489-491.
HAO Hai-jin,ZHANG Yong .Stability analysis of coal wall in full-seam cutting workface with fully-mechanized in thick seam[J].Journal of Liaoning Technical University,2005,24(4):489-491.
[4] 尹希文,闫少宏,安宇. 大采高综采面煤壁片帮特征分析与应用[J].采矿与安全工程学报,2008,25(2):222-225.
YIN Xi-wen1,YAN Shao-hong1,AN Yu.Characters of the Rib Spalling in Fully Mechanized Caving Face with Great Mining Height[J].Journal of Mining & Safety Engineering,008,25(2):222-225.
[5] 杨培举,刘长友,吴峰峰. 厚煤层大采高采场煤壁的破坏规律与失稳机理[J].中国矿业大学学报,2012,41(3):371-377.
YANG Pei-ju1,LIU Chang-you1,WU Feng-feng1.Breakage and falling of a high coal wall in a thick mined seam.Journal of China University of Mining & Technology,2012,41(3):371-377.
[6] 刘长友,黄炳香,常兴明.安宇极软厚煤层大采高台阶式综采端面煤岩稳定性控制研究[J].中国矿业大学学报,2008,37(6):734-739.
LIU Chang-you1,HUANG Bing-xiang,CHANG Xing-min,WANG Jun1,WEI Min-tao.Study on Tip-to-Face Coal and Rock Stability Control of Fully Mechanized Stepped Large Cutting Height Mining in Extremely Soft Thick Seam[J].Journal of China University of Mining & Technology,2008,37(6):734-739.
[7] 王家臣.极软厚煤层煤壁片帮与防治机理[J]. 煤炭学报,2007,32(8):785-788.
WANG Jia-chen.Mechanism of the rib spalling and the controlling in the very soft coal seam[J].Journal of China Coal Society,2007,32(8):785-788.
[8] 王建树,黄炳香,魏民涛.极软突出厚煤层大采高综采片帮冒顶防治技术[J].煤炭科学技术,2007,35(11):64-67.
WANG Jian-shu1,HUANG Bing-xiang,WEI Min-tao.Prevention and control technology for side wall and roof falling in fully mechanized mining face in outburst soft seam with high cutting[J].Coal Science and Technology,2007,35(11):64-67.
[9] 袁永,屠世浩,马小涛,孙璐璐等.“三软”大采高综采面煤壁稳定性及其控制研究[J].采矿与安全工程学报,2012,29(1):21-25.
YUAN Yong,TU Shi-hao,MA Xiao-tao,SUN Lu-lu,BAI Qing-sheng.Coal Wall Stability of Fully Mechanized Working Face with Great Mining Height in "Three Soft" Coal Seam and Its Control Technology[J].Journal of Mining & Safety Engineering,2012,29(1):21-25.
[10] 张顶立,何佐德.综放工作面端面冒顶机理及控制[J].湘潭矿业学院学报,2001,16(3):11-15.
ZHANG Ding li,HE Zuo de. Roof falling mechanism of face area in fully-mechanized sub-levelcaving mining face and its control[J].Journal of Xiangtan Mining Institute,2001,16(3):11-15. |