煤炭工程 ›› 2014, Vol. 46 ›› Issue (8): 146-148.doi: 10.11799/ce201408046

• 工程管理 • 上一篇    

煤炭工程施工合同常见问题探析与管理

陈金库1,王丽杰2   

  1. 1. 山东科技大学
    2. 中煤科工集团沈阳设计研究院有限公司
  • 收稿日期:2014-03-17 修回日期:2014-04-29 出版日期:2014-08-11 发布日期:2014-08-10
  • 通讯作者: 王丽杰 E-mail:wanglijie7955@163.com

The common problem and management of coal-fired power project contract

  • Received:2014-03-17 Revised:2014-04-29 Online:2014-08-11 Published:2014-08-10

摘要:

为明确煤炭工程施工合同当事人的权利、义务和责任,防范人为干扰,杜绝随意性,避免争议、延误工期和经济损失,提高项目经济效益,本文从煤炭工程实际出发,运用合同法等相关法律法规,分析了煤炭工程施工合同履行中的突出问题:合同施工范围、设备供货范围、土建与安装工程范围约定不明,设备与材料界限不清,工程量计算规则适用不当,合同约束弱化、人为随意变更等。提出加强煤炭工程施工合同管理的对策:①合同内容约定要全面、完整、明确、具体,规避合同风险;②建立煤炭工程施工合同管理体系,厘清责任,保证合同约束力;③制订煤炭施工合同标准文本,强化合同动态管理。

关键词: 煤炭工程施工合同, 合同约束力, 合同管理

Abstract:

In order to clarify the contract parties’rights,obligations and responsibilities of the Coal Engineering,to prevent the human interference,to eliminate the randomness,as well as to avoid the controversy,the schedule delays and the economic losses,this paper analyzes the prominent issues in the performance of the construction contract from the reality of the Coal Engineering with the contract laws and other relevant laws and regulations.These issues include the ambiguous agreement on the scopes like the construction scope in the contract,the scope of the equipment supply,and the scope of the construction and the installation work;the unclear boundary between the equipment and the material;the inappropriate use of the calculation rules for the work amount;the weakened binding force of the contract and the man-made changes,etc.The strategies to improve the management of the Coal Engineering construction contract are proposed:①To make the contract’s content comprehensive, complete,clear and specific, evading the contract risks;②To establish the management system for the Coal Engineering construction contract,clarifying the responsibilities and ensuring the binding force of the contract;③To develop a standard text for the coal construction contract and to enhance the dynamic management of the contract.

Key words: the construction contract of the Coal Engineering, the binding force of the contract, contract management