煤炭工程 ›› 2014, Vol. 46 ›› Issue (10): 158-161.doi: 10.11799/ce201410045
• 研究探讨 • 上一篇 下一篇
何尚森
收稿日期:
修回日期:
出版日期:
发布日期:
通讯作者:
基金资助:
国家自然科学基金资助项目;国家重点基础研究发展计划;中央高校基本科研业务费专项资金资助
Received:
Revised:
Online:
Published:
摘要:
基于同忻矿大采高综放面支架—围岩系统失稳机理,探究影响综放面稳定性的因素,建立了大采高综放面支架—围岩系统失稳事故树;运用三角模糊函数和布尔代数法求出顶事件发生的模糊概率,评价系统的安全性;对基本事件的模糊重要度进行排序,从而确定导致综放面支架—围岩系统失稳的主要因素。
关键词: 大采高综放面, 支架—围岩系统失稳, 事故树, 三角模糊数
Abstract:
Based on the instable mechanism of fully mechanized caving face with large cutting height bracket - rock system of special thick coal seam in Tongxin coal, the author explores the elements which impact the stability of fully mechanized caving face, meanwhile establishes the instable fault tree. Using triangular fuzzy function and Boolean algebra method, the author calculates the probability of the occurrence of the top event and evaluates the security of the system. The author also ranks the importance by calculating the fuzzy importance of the basic events, and thus ascertains the main elements causing the fault of fully mechanized caving face with large cutting height bracket - rock system.
Key words: fully mechanized caving face, bracket - rock system instability, fault tree, triangular fuzzy numbers
何富连,赵志志,何尚森,等. 大采高综放面支架—围岩系统失稳的模糊事故树法研究[J]. 煤炭工程, 2014, 46(10): 158-161.
0 / / 推荐
导出引用管理器 EndNote|Reference Manager|ProCite|BibTeX|RefWorks
链接本文: http://www.coale.com.cn/CN/10.11799/ce201410045
http://www.coale.com.cn/CN/Y2014/V46/I10/158
[1] 孔令海,姜福兴,王存文. 特厚煤层综放采场支架合理工作阻力研究[J]. 岩石力学与工程学报,2010. [2] 李青,陆廷金,李宁萍等. 三角模糊数的模糊故障树分析及其应用[J]. 中国矿业大学学报,2000. [3] 贾智伟,景国勋,张 强等. 基于三角模糊数的矿井火灾事故树分析[J]. 安全与环境学报,2004. [4] 李青,陆廷金. 模糊重要度分析方法的研究[J]. 模糊系统与数学,2000. [5] Mitauo Y.The median for a L-R fuzzy number [J].Micro electron. Relia,1995,35(2):269~271.