煤炭工程 ›› 2015, Vol. 47 ›› Issue (5): 58-60.doi: 10.11799/ce201505020
• 施工技术 • 上一篇 下一篇
韩贵兴,陈启辉
收稿日期:
修回日期:
出版日期:
发布日期:
通讯作者:
Received:
Revised:
Online:
Published:
摘要: 针对义煤集团金鼎矿风井回风大巷破碎底板及高承压水特殊地质条件,研究了巷道产生底鼓的机理及原因,并通过浅部和深部相结合的注浆方式,对巷道底板底鼓进行治理,结果表明:通过对巷道底板浅部离层区及寒灰含水层浅深部相结合的注浆加固方式,有效的降低了巷道涌水量,对巷道底鼓进行了有效的控制。
关键词: 破碎底板, 高承压水, 底鼓治理, 注浆加固
Abstract: Abstract: this article is based on the return air alleys of ventilation shaft which gets crushing plate and high confined water special geological conditions in Jin ding mine of Yi colliery .To study the reasons and mechanism of floor heave of roadway, and through the combination of shallow and deep way of grouting to carried out the floor heave of roadway floor management. The results show that the roadway floor away from the Cambrian limestone water is only 39 m, under the influence of the construction drilling in the early stage, the Cambrian limestone water is shallow import floor, the roadway floor heave has happened under the combination of mine pressure and high pressure water. Through the method of combining roadway bottom aquifer of shallow deep and shallow overburden bed separation grouting to reinforce the Cambrian limestone. Through this way to reduce the roadway water inflow and control the floor heave of roadway effectively.
Key words: The key word: Broken Floor, High Pressure Water, Harness of floor heave, Grouting reinforcement
中图分类号:
TD712+.6
韩贵兴,陈启辉. 破碎底板和承压水条件下巷道底鼓治理技术研究[J]. 煤炭工程, 2015, 47(5): 58-60.