[1] 张幼蒂, 李克民, 尚涛, 等.露天矿拉斗铲倒堆剥离工艺系统的优化决策[J].露天采矿技术, 2005, (6):1-5
[2]D P Singh, M M Singh.Blast Casting in Surface Excavations-A Global Scenario[J].Mining Technology, 1996, 78(894):55-59
[3]Tagieddin S A.Applicability of Blast Casting Technique in Strip-Mining Phosphate Rock[J].Engineering Geology, 1992, 33(2):127-139
[4]李克民, 张幼蒂, 傅洪贤.露天煤矿抛掷爆破参数分析[J].采矿与安全工程学报, 2006, 23(4):423-426
[5]LI Ke-min, ZHANG You-di, FU Hong-xian.Analysis of Casting Blast Parameters in Surface Coal Mines[J].Journal of Mining& Safety Engineering, 2006, 23(4):423-426
[6] 王平亮, 常全胜, 殷佰良.黑岱沟矿后续开采工艺的经济合理性初探[J].露天采矿技术, 2002, (1):15-16
[7]张幼蒂, 傅洪贤, 王启瑞, 等.抛掷爆破与剥离台阶开采参数分析[J].中国矿业大学学报, 2003, 32(1):27-30
[8]ZHANG You-di, FU Hong-xian, WANG Qi-rui, etal.Casting Blast and Analysis of Mining Parameters of Stripping Bench[J].Journal of China University of Mining & Technology, 2003, 32(1):27-30
[9]马军, 李克民.抛掷爆破与拉斗铲倒堆工艺研究[J].中国矿业, 2003, 12(7):44-46
[10]MA Jun, LI Ke-min.Study on Throw Blasting and Pull Shovel Handling[J].China mining magine, 2003, 12(7):44-46
[11]尚涛, 周伟, 才庆祥, 等.厚覆盖层拉斗铲倒堆工艺下采煤系统稳定性[J].采矿与安全工程学报, 2010, 27(2):175-178
[12]SHANG Tao, ZHOU Wei, CAI Qing-xiang, etal.Stability of Coal Mining System Under Dragline Stripping Technology with Thick Overburden[J].Journal of Mining & Safety Engineering, 2010, 27(2):175-178
[13] 王桂林, 刘海建.抛掷爆破-拉斗铲倒堆工艺的应用与创新[J].露天采矿技术, 2010, (1):14-17
[14] 李克民, 马军, 张幼蒂, 等.拉斗铲倒堆剥离工艺及在我国应用前景[J].煤炭工程, 2005, (10):46-48
[15]Li Ke-min, Ma Jun, Zhang You-di, et al.Open Cast Method and Its Application Prospect in Surface Mines in China[J].Coal Engineering, 2005, (10):46-48
[16]周伟, 才庆祥, 张国营, 等.厚覆盖层拉斗铲工艺的运煤系统研究[J].中国矿业大学学报, 2011, 40(1):49-53
[17]ZHOU Wei, CAI Qing-xiang, ZHANG Guo-ying, et al.Study of How the Coal Haulage System Affects Dragline Stripping with a Thick Overburden[J].Journal of China University of Mining & Technology, 2011, 40(1):49-53
[18] 秦益泽.拉斗铲倒堆剥离的运煤方式与剥采程序研究[J].露天采矿技术, 2010, (5):17-19
[19].
[20] 韩占占, 周伟, 罗怀廷.露天煤矿两种生产工艺推进度分析[J].露天采矿技术, 2010, (3):25-27,80
[21]才庆祥, 彭世济, 张达贤.提高露天矿工艺系统可靠性的途径[J].中国矿业大学学报, 1994, 23(4):64-69
[22]CAI Qing-xiang, PENG Shi-ji, ZHANG Da-xian.Approaches to Improving the Reliability of Mining Technological Systems in Surface Mines[J].Journal of China University of Mining & Technology, 1994, 23(4):64-69
[23]才庆祥, 周伟, 彭洪阁, 等.厚覆盖层下拉斗铲剥离与半连续采煤系统的可靠性[J].煤炭学报, 2009, 34(11):1456-1459
[24]CAI Qing-xiang, ZHOU Wei, PENG Hong-ge, etal.Reliability of Dragline Stripping and Semi-Continuous Mining Coal System Under the Thick Overburden[J].Journal of China Coal Society, 2009, 34(11):1456-1459
[25]刘希亮, 赵学胜, 陆锋, 等.基于 - 的露天矿抛掷爆破抛掷率预测[J].煤炭学报, 2012, 37(12):1999-2005
[26]LIU Xi-liang, ZHAO Xue-sheng, LU Feng, et al.A GA-SVM Based Model for Throwing Rate Prediction in the Open-Pit Cast Blasting[J].Journal of China Coal Society, 2012, 37(12):1999-2005
[27] 马力, 李克民, 丁小华, 等.黑岱沟露天矿抛掷爆破效果的模糊综合评价[J].金属矿山, 2011, (9):58-60
[28]Ma Li, Li Ke-min, Ding Xiao-hua, et al.Fuzzy Synthetic Evaluation on Casting Blast Effect of Heidaigou Surface Coal Mine[J].METAL MINE, 2011, (9):58-60
[29]李祥龙, 何丽华, 栾龙发, 等.露天煤矿高台阶抛掷爆破爆堆形态模拟[J].煤炭学报, 2011, 36(9):1457-1462
[30]LI Xiang-long, HE Li-hua, LUAN Long-fa, etal.Simulation Model For Muckpile Shape of High Bench Cast Blasting in Surface Coal Mine[J].Journal of China Coal Society, 2011, 36(9):1457-1462
[31] 马力, 李克民, 丁小华, 等.抛掷爆破岩体抛掷距离影响因素研究[J].工程爆破, 2013, (1):50-53
[32]MA Li, LI Ke-min, DING Xiao-hua, et al.Study on the Influencing Factors on Casting Distance of Rock By Casting Blast [J].Engineering Blasting, 2013 , (1):50-53
|