煤炭工程 ›› 2017, Vol. 49 ›› Issue (2): 5-6.doi: 10.11799/ce201702002

• 设计技术 • 上一篇    下一篇

平顶山矿区老矿井排矸系统改造方案探讨

付向朝   

  1. 平顶山平煤设计院
  • 收稿日期:2016-04-05 修回日期:2016-04-19 出版日期:2017-02-09 发布日期:2017-03-09
  • 通讯作者: 付向朝 E-mail:fu0375@163.com

To explore the old mine gangue in Pingdingshan mining area system

  • Received:2016-04-05 Revised:2016-04-19 Online:2017-02-09 Published:2017-03-09

摘要: 阐述了平煤股份十矿现有排矸系统存在问题,从技术上分析了矿井排矸系统改造的可行性。通过对改造方案的安全、技术、经济比选,得出结论为:采用置换井筒功能和新建专用排矸巷道是符合平顶山矿区老矿井实际生产的改造方案,对邻近矿井排矸系统的改造提供借鉴经验。

关键词: 排矸系统, 改造方案, 技术改造, 经济比选

Abstract: Describes the 10 mine of Pingmei shares existing waste discharge system problems, from a technical analysis of the mine feasibility of system transformation of refuse. Through the renovation scheme of safety, technical and economic comparison, draws the conclusion: the replacement of wellbore and new special gangue roadway is in line with the retrofit scheme of Pingdingshan mining area of the old mine actual production, the nearby mines row gangue system transformation provides reference experience

中图分类号: