煤炭工程 ›› 2018, Vol. 50 ›› Issue (2): 16-18.doi: 10.11799/ce201802004

• 设计技术 • 上一篇    下一篇

斜井穿越含水流砂层管井降水技术研究

于新锋   

  1. 中煤科工集团武汉设计研究院有限公司
  • 收稿日期:2017-09-05 修回日期:2017-10-17 出版日期:2018-02-20 发布日期:2018-04-23
  • 通讯作者: 于新锋 E-mail:yuxinfeng79@163.com

Research on Tube Well Dewatering of Inclined Shaft Excavating across Sand Layer Containing Water Flow

  • Received:2017-09-05 Revised:2017-10-17 Online:2018-02-20 Published:2018-04-23

摘要: 为使斜井顺利穿越含水流砂层,根据管井降水机理,通过理论计算分析,合理确定管井流量、深度及布置方式。采用管井降水技术,通过局部降低含水流砂层水位标高,并加强掘进工作面临时支护,提高了工作面围岩稳定性,使土体产生固结,防止了工作面溃砂、冒顶事故,为斜井井筒快速、安全通过含水流砂层奠定了基础,也为类似条件下井筒施工提供了参考。

关键词: 斜井井筒, 含水流砂层, 管井降水, 管棚支护

Abstract: In the inclined shaft, the tube well dewatering is adopted to improve the stability of the surrounding rock by reducing the water level of the aquifer, so that the soil consolidation, to prevent the work surface collapse, roofing accident,Which laid the foundation for the rapid and safe construction of the inclined shaft, and provided the reference for the construction of the wellbore under similar conditions.