煤炭工程 ›› 2018, Vol. 50 ›› Issue (12): 24-27.doi: 10.11799/ce201812007

• 设计技术 • 上一篇    下一篇

不同储煤形式储量精确计算

孙再征   

  1. 中煤西安设计工程有限责任公司
  • 收稿日期:2018-04-26 修回日期:2018-06-14 出版日期:2018-12-20 发布日期:2019-03-19
  • 通讯作者: 孙再征 E-mail:sun6072326@163.com

Capacity Accurate Calculation for Different Coal Storage Facility

  • Received:2018-04-26 Revised:2018-06-14 Online:2018-12-20 Published:2019-03-19

摘要: 针对选煤厂煤炭储存储量无法精确计算的问题,通过对储煤形式内部煤炭堆积状态分析,结合BIM技术,利用三维建模软件自身的布尔运算,创建三维模型,精确计算出不同规格不同储煤形式下的煤炭储量,该建模计算方法不仅可以解决煤炭储量精确计算的问题,也可借鉴到其它物料的精确储存计算中。

关键词: 储量, 建模, 圆筒仓, 旋转, 拉伸

Abstract: Aiming at the problem of coal storage capacity can not be calculated accurately in coal preparation plant, this paper which analyzes coal accumulation state in coal storage facility, establishes three-dimensional model by using BIM technology. The calculation method can not only solve the problem of accurate calculation of coal storage capacity, but also learn from the accurate storage capacity of other materials in the calculation.

中图分类号: