煤炭工程 ›› 2021, Vol. 53 ›› Issue (5): 51-56.doi: 10.11799/ce202105010

• 施工技术 • 上一篇    下一篇

大断面托顶煤巷道支护技术研究

孙小岩1,贺永亮2,张志聪2   

  1. 1. 成都理工大学
    2. 中国矿业大学
  • 收稿日期:2020-06-16 修回日期:2020-09-09 出版日期:2021-05-20 发布日期:2021-05-17
  • 通讯作者: 贺永亮 E-mail:517214327@qq.com

Research on support technology of coal roadway with large cross section

  • Received:2020-06-16 Revised:2020-09-09 Online:2021-05-20 Published:2021-05-17
  • Contact: he yongliang E-mail:517214327@qq.com

摘要: 随着煤矿开采深度的不断加深,为了满足大型设备的正常使用,巷道断面的日益扩大,给巷道支护及围岩稳定性带来巨大挑战。基于义马常村矿21170工作面巷道工程地质条件,采用现场测试、数值模拟、理论分析及现场试验等方法,对大断面托顶煤巷道的破坏特征进行分析,研究了大断面托顶煤巷道的变形破环特征和支护理论,大断面托顶煤巷道变形破坏的诱发因素,提出了大断面托顶煤巷道“全断面控型易损部位强化控制技术”,并确定21170工作面巷道的扩掘方案,现场应用效果显著。对大断面托顶煤同类巷道支护具有借鉴作用。

关键词: 巷道断面, 托顶煤, 围岩支护, 梯次支护, 让压减跨

Abstract: With the development of coal mining in Yima mining area, the mining depth continues to extend downward, and coal mining activities in areas with complex structures are inevitable. In order to improve production efficiency, large-scale equipment is gradually being adopted by coal mines. At the same time, the cross-sectional area of the roadway is also expanding to meet the needs of the use of large equipment and ventilation. The large cross-section roadway reduces the stability of the surrounding rock and brings another huge challenge to the support of the roadway. The roadway of 21170 mining face in Changcun Coal Mine is a typical large-section supporting roadway with serious deformation and heavy repair work, which has seriously affected the safe and efficient production of the working face. This article is based on the engineering geological conditions of roadway in 21170 working face of Yima Changcun Mine , Using on-site testing, numerical simulation, theoretical analysis and on-site testing methods to analyze the destruction characteristics of large-section support roadway, study the deformation and ring-breaking characteristics and support theory of large-section support roadway, large-section support Factors inducing deformation and failure of roof coal roadway, finally, the support technology of large section supporting roof coal roadway was determined and the expansion plan of 21170 working face roadway was determined.