煤炭工程 ›› 2022, Vol. 54 ›› Issue (9): 6-11.doi: 10.11799/ce202209002

• 设计技术 • 上一篇    下一篇

大采高工作面小(无)煤柱开采技术适应性研究

于健浩   

  1. 中煤科工开采研究院有限公司
  • 收稿日期:2022-06-06 修回日期:2022-07-12 出版日期:2022-09-15 发布日期:2022-10-09
  • 通讯作者: 于健浩 E-mail:yujh620@126.com

Research on adaptability of mining technology for small (no) coal pillar in large mining height face

  • Received:2022-06-06 Revised:2022-07-12 Online:2022-09-15 Published:2022-10-09

摘要: 为了延长矿井服务年限,以山西福达煤矿15202工作面为例,从小(无)煤柱开采技术角度研究资源回收率提升的可行性。根据该工作面开采条件,分别设计了小煤柱护巷、沿空留巷、沿空留墙技术方案,并从技术、安全、经济三方面对各方案进行分析,结果表明:小煤柱护巷实施难度最低,投资少见效快,安全性较好,但长期效益最低|沿空留墙受扩巷施工制约,短期效益较低,但安全性最高|沿空留巷受扩巷及回风系统施工影响,短期效益最低,巷道二次复用维护难度较高,但长期效益最高。考虑到矿井短期内如采用沿空留墙、沿空留巷两方案将严重制约矿井整体效益,最终决定15202工作面采用小煤柱开采技术,后期采掘接续紧张局面得到缓解后再改用沿空留巷布置方式。

关键词: 大采高工作面, 小(无)煤柱护巷, 沿空留墙, 沿空留巷

Abstract: Coal resources in some mining areas in Shanxi Province are decreasing year by year, and some old mining areas face the risk of resource depletion. In order to prolong the service life of the mine, taking the 15202 working face of Fuda mine in Shanxi as an example, the feasibility of improving the resource recovery rate was studied from the perspective of roadway layout. According to the mining conditions of the working face, the technical schemes of small coal pillar support lane, gob-side retaining wall and along the empty lane are designed respectively, and each scheme is analyzed from the aspects of technology, safety and economy. The results show that: small coal pillar protection The roadway has the lowest implementation difficulty, less investment and quicker results, better safety, but the lowest long-term benefit; small coal pillar support lane is restricted by the construction of roadway expansion, so the short-term benefit is low, but the safety is the highest; along the empty lane is affected by roadway expansion and return air the impact of system construction, the short-term benefit is the lowest, the secondary reuse and maintenance of the roadway is more difficult, but the long-term benefit is the highest. Considering that the two schemes of gob-side retaining wall and gob-side entry retaining seriously restrict the overall benefits of the mine in the short term, the 15202 working face adopts the small-pillar mining technology, and the gob-side retaining wall arrangement is changed after the tension of the excavation is relieved in the later stage.